Rehabilitation / Major Repair of Drainage Structure24OC0041

Rehabilitation of Drainage System at Lopez Village, Barangay San Isidro, Parañaque City

Rehabilitation of Drainage System at Lopez Village, Barangay San Isidro, Parañaque City is a DPWH-tracked public work in CITY OF PARAÑAQUE (METROPOLITAN MANILA), PARAÑAQUE CITY, National Capital Region. Reported contract value: ₱19,599,817.96. Status: Reported complete (DPWH). Contractor on record: G F ROVERO MERCHANDISING. Figures trace to sumbong.

CITY OF PARAÑAQUE (METROPOLITAN MANILA), PARAÑAQUE CITY, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱10,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-24-0018640 · · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱19,207,330 · G.F. ROVERO MERCHANDISING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-07-06 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · NCR, Fourth District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Rehabilitation of Drainage System at Lopez Village, Barangay San Isidro, Parañaque City

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Drainage System along Westbank Road, Manggahan Floodway, Pasig City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-24-0018640

₱0.00 · FY2024

Released to Regional Office V (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0008761

₱141,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0003336

₱309,005.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0016746

₱30,000,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-NCR-24-0008744

₱1,531,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Rehabilitation of Drainage System

₱19,207,330.00 · G.F. ROVERO MERCHANDISING

Award / contract ref: 24OC0041

Contractor

B

234 projects · ₱3.4B total · 2 flags

4. Implementation

Contract Amount

₱19,599,817.96

Progress

Reported complete (DPWH)

Start Date

February 14, 2024

Target End

July 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ParañaqueSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.

Drainage – ParañAque City (2024) | Love the Philippines