GAA 2025 DA FMR25CF0133

CONCRETING OF BRGY. MACATBONG TO BRGY. KALIKID NORTE FMR, BRGY. MACATBONG TO BRGY. KALIKID NORTE, CABANATUAN CITY, NUEVA ECIJA

CONCRETING OF BRGY. MACATBONG TO BRGY. KALIKID NORTE FMR, BRGY. MACATBONG TO BRGY. KALIKID NORTE, CABANATUAN CITY, NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 2nd DEO, Region III. Reported contract value: ₱29,700,750.19. Status: Reported complete (DPWH). Contractor on record: CCF EARTHMOVING CORP. Figures trace to dpwh.

Nueva Ecija 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱35,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-LGRCB-25-0003885 · ₱250,353 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25CF0133 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-03-22 → 2022-03-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. MACATBONG TO BRGY. KALIKID NORTE FMR, BRGY. MACATBONG TO BRGY. KALIKID NORTE, CABANATUAN CITY, NUEVA ECIJA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Pampanga River, Barangay Calaba, San Isidro, Nueva Ecija
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-LGRCB-25-0003885

₱250,353.00 · FY2025

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

88 projects · ₱665.6M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. ARIENDO FMR, BRGY. ARIENDO, BONGABON, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2024₱29.8M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRAVO BRIDGE, PALAYAN CITY, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱29.3M
Past target date (DPWH On-Going)
No sat.

BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - CABU BR. (B00117LZ) ALONG NUEVA ECIJA - AURORA RD

Nueva Ecija 2nd DEO, Region III

2024₱28.1M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KALIKID SUR, CABANATUAN CITY, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱19.3M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO KHOA, BARANGAY KALIKID SUR, CABANATUAN CITY

Nueva Ecija 2nd DEO, Region III

2025₱19.3M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - STA ROSA -TARLAC RD - K0108+000 - K0108+897

Nueva Ecija 2nd DEO, Region III

2025₱16.4M
Past target date (DPWH On-Going)
View all 88 projects →

4. Implementation

Contract Amount

₱29,700,750.19

Progress

Reported complete (DPWH)

Start Date

March 25, 2025

Target End

August 18, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaCity of CabanatuanKalikid Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.