Roads22PF0066

CONCRETING OF SITIO UPPER PATKIAW TO SITIO NAN-AGTO, BRGY. NATUBLENG FMR, BRGY. NATUBLENG, BUGUIAS, BENGUET

CONCRETING OF SITIO UPPER PATKIAW TO SITIO NAN-AGTO, BRGY. NATUBLENG FMR, BRGY. NATUBLENG, BUGUIAS, BENGUET is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱12,431,448.47. Status: Reported complete (DPWH). Contractor on record: BTCJR CONST AND ENGINEERING SERVICES. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-22-0014577 · ₱25,899,956 · release to the district office, not itemized per project

    Possible match · score 0.57

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22PF0066 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-11-18 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF SITIO UPPER PATKIAW TO SITIO NAN-AGTO, BRGY. NATUBLENG FMR, BRGY. NATUBLENG, BUGUIAS, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Nabalicong, Natubleng, Buguias, Benguet
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-22-0014577

₱25,899,956.00 · FY2022

Released to Regional Office - V (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

19 projects · ₱199.1M total · 0 flags

Other projects by this contractor

No sat.

Construction of Magmagaling Flood Control, Sta. 4+572 - Sta. 4+800 (L.S.), Sta. 4+406 - Sta. 4+800 (R.S.), Buguias, Benguet

BENGUET, Cordillera Administrative Region

2021₱29.4M
Reported complete (DPWH)
No sat.

Construction of Central Buguias Flood Control along Agno River, Poblacion, Buguias, Benguet

BUGUIAS (BENGUET), BENGUET, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES KAPANGAN CENTRAL GASWILING CATIAOAN ROAD BAGULIN ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, CUTFLOWERS AND FRUIT TREES INDUSTRY, KAPANGAN, BENGUET,

Benguet 2nd DEO, Cordillera Administrative Region

2021₱15.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BAGUIO-BONTOC ROAD JCT.- MADAYMEN-MASALA-SAGPAT ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, CUTFLOWERS AND FRUIT TREES INDUSTRY

Benguet 2nd DEO, Cordillera Administrative Region

2019₱14.7M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. CALIKING (ALONG DAMSITE) FMR, BRGY. CALIKING, ATOK, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2022₱12.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, HYDRO-NANGALISAN SECTION, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2020₱11.8M
Reported complete (DPWH)
View all 19 projects →

4. Implementation

Contract Amount

₱12,431,448.47

Progress

Reported complete (DPWH)

Start Date

June 1, 2022

Target End

January 6, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetBuguiasNatubleng
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.