Roads17BB0019

NETWORK DEV'T-OFF-CARRIAGEWAY IMPRV'T INCLUDING DRAINAGE-TERTIARY OFF-CARRIAGEWAY IMPRV'T:SHOULDER PAVING/CONST-JCT.MAGAPIT-CAPISSAYAN RD.-K0557+(-225.70)-K0560+252,K0560+283-K0560+475,BRGY.MAGAPIT,LAL-LO,CAG. TO BRGY.NADDUNGAN,GATTARAN,CAGAYAN (S00686LZ)

NETWORK DEV'T-OFF-CARRIAGEWAY IMPRV'T INCLUDING DRAINAGE-TERTIARY OFF-CARRIAGEWAY IMPRV'T:SHOULDER PAVING/CONST-JCT.MAGAPIT-CAPISSAYAN RD.-K0557+(-225.70)-K0560+252,K0560+283-K0560+475,BRGY.MAGAPIT,LAL-LO,CAG. TO BRGY.NADDUNGAN,GATTARAN,CAGAYAN (S00686LZ) is a DPWH-tracked public work in Cagayan 1st DEO, Region II. Reported contract value: ₱53,221,383.00. Status: Reported complete (DPWH). Contractor on record: KYRO BUILDERS INC. Figures trace to dpwh.

Cagayan 1st DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.78

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0011469 · ₱5,880,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱53,221,383 · KYRO BUILDERS INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-13 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEV'T-OFF-CARRIAGEWAY IMPRV'T INCLUDING DRAINAGE-TERTIARY OFF-CARRIAGEWAY IMPRV'T:SHOULDER PAVING/CONST-JCT.MAGAPIT-CAPISSAYAN RD.-K0557+(-225.70)-K0560+252,K0560+283-K0560+475,BRGY.MAGAPIT,LAL-LO,CAG. TO BRGY.NADDUNGAN,GATTARAN,CAGAYAN (S00686LZ)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 78%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Cabicungan Flood Control Project along Cabicungan River at Centro 4, Claveria, Cagayan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0011469

₱5,880,000.00 · FY2017

Released to PENRO Zamboanga Modifi del Norte Expens develo Zamboa (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Network Development-Off-Carriageway Improvement in

₱53,221,383.00 · KYRO BUILDERS INC

Award / contract ref: 17BB0019

Contractor

C

36 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF SAN REMIGIO-BUGO ROAD CONNECTING - ODIONG-SIBALOM-SAN REMIGIO-LEON ROAD, ANTIQUE

Antique DEO, Region VI

2025₱144.6M
Past target date (DPWH On-Going)
No sat.

MFO 1:NAT'L RD. NETWORK SERVICES:NETWORK DEV'T:IMPV'T/WIDENING OF NAT'L ROADS, ALONG N1 CAGAYAN VALLEY RD., K0511+(-104)-K0512+000=STA.511 +(-140)-STA.512+.50, K0513+570-K0514+813.50=STA. 513+571-STA. 514+813.50, ALCALA, CAGAY

Region II, Region II

2017₱141.9M
Reported complete (DPWH)
No sat.

MFO 2: FLOOD MANAGEMENT SERVICES: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL SYSTEM, DACAL-LA FUGU, CAMALANIUGAN,

Region II, Region II

2017₱140.9M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCL. DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4 (HDM4) SECONDARY ROADS, NUEVA ECIJA-PANGASINAN ROAD, N.E. 1ST LEGISLATIVE DIST. PROV. OF N.E.

Region III, Region III

2017₱108.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING OF CORON-BUS RD K0058+221-K0058+540; K0064+987-K0066+605; K0066+617-K0068+566;K0068

Region IV-B, Region IV-B

2016₱108.1M
Reported complete (DPWH)
No sat.

CONST./IMPR'VT. OF ACCESS ROADS LEADING TO AIRPROTS, SEAPORTS & DECLARED TOURISM DEST.-TO DECLARED TOURISM DEST.-CONST./REHAB. OF ACCESS ROAD THROUGH BRGY. PIAS LEADING TO MINALUNGAO NAT'L. PARK INCL. BAYUBUK & SANGILO BRIDGES, GEN. TINIO, N.E. 4TH L.D.NE

Region III, Region III

2016₱94.2M
Reported complete (DPWH)
View all 36 projects →

4. Implementation

Contract Amount

₱53,221,383.00

Progress

Reported complete (DPWH)

Start Date

May 15, 2017

Target End

December 29, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanLal-LoMagapit
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.