Roads17PF0013

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱45,883,600.00. Status: Reported complete (DPWH). Contractor on record: VALLEY CONST AND AGGREGATES. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0001213 · ₱120,000 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱43,776,658 · VALLEY CONSTRUCTION AND AGGREGATES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2024-01-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Amburayan Flood Control, Taba-ao, Kapangan, Benguet
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0001213

₱120,000.00 · FY2017

Released to Kawayan National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

17PF0013 ROAD UPGRADING ALONG AKKB

₱43,776,658.21 · VALLEY CONSTRUCTION AND AGGREGATES

Contractor

C

8 projects · ₱240.1M total · 0 flags

Other projects by this contractor

No sat.

OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG BENGUET-NUEVA VIZCAYA ROAD, K0298+853 - K0304+000, BOKOD, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2017₱44.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, JCT-TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD, K0435+170-K0472+420 (S00593LZ)

Mountain Province 2nd DEO, Cordillera Administrative Region

2018₱37.5M
Reported complete (DPWH)
No sat.

ND - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN RD, K0343 + -746 - K0343 + 511, K0344 + 117 - K0344 + 203, K0344 + 228 - K0345 + 534, K0345 + 570 - K0346 + 604

Benguet 2nd DEO, Cordillera Administrative Region

2017₱34.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, IMPROVEMENT OF KALIMBATAWA CIRCUMFERENTIAL ROAD AND DRAINAGES AT SITIO KALIMBATAWA, OTUCAN SUR, STA. 0+

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱25.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, NACAWANG-MABALITE ROAD CONNECTING BARANGAYS BATAYAN AND MABALITE IN SUPPORT TO SUGARCANE, COFFEE, MANGO AND FURNITURE INDUSTRIES, TADIAN, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱23.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWINPEAKS FLOOD CONTROL, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2017₱19.6M
Reported complete (DPWH)
View all 8 projects →

4. Implementation

Contract Amount

₱45,883,600.00

Progress

Reported complete (DPWH)

Start Date

April 6, 2017

Target End

November 30, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetBakunPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.