Bridges17PI0021

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, SECONDARY, AMPAWILEN BR. (B04296LZ) ALONG MT. PROVINCE-CAGAYAN VIA TABUK-ENRILE ROAD

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, SECONDARY, AMPAWILEN BR. (B04296LZ) ALONG MT. PROVINCE-CAGAYAN VIA TABUK-ENRILE ROAD is a DPWH-tracked public work in Mountain Province 1st DEO, Cordillera Administrative Region. Reported contract value: ₱953,187.99. Status: Reported complete (DPWH). Contractor on record: SADLAN CONST. Figures trace to dpwh.

Mountain Province 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXII-17-0010461 · ₱7,894,582 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17PI0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2023-07-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, SECONDARY, AMPAWILEN BR. (B04296LZ) ALONG MT. PROVINCE-CAGAYAN VIA TABUK-ENRILE ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-17-0010461

₱7,894,582.00 · FY2017

Released to Division of South Cotabato (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

40 projects · ₱254.4M total · 0 flags

Other projects by this contractor

No sat.

NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (CALAMITY FUND) - RECONSTRUCTION, REHABILITATION, REPAIR, AID, RELIEF AND OTHER WORKS OR SERVICES, INCLUDING PRE-DISASTER ACITVITIES: IMPLEMENTATION OF VARIOUS FLOOD CONTROL PROJECTS IN MOUNTAIN PROVIN

Mountain Province 1st DEO, Cordillera Administrative Region

2017₱43.6M
Reported complete (DPWH)
No sat.

Construction of Wawang Flood Control Structure, Sta. 32 + 180 - Sta. 32 + 250 (L.S.), Sta. 32 + 184 - Sta. 32 + 264 (R.S.), Sta. 32 + 328 - Sta. 32 + 358 (L.S.), Sta. 32 + 335 - Sta. 32 + 375 (R.S.) along Talubin River, Bontoc, Mountain Province

BONTOC (CAPITAL) (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0377+(-367) - K0377+(-281), K0380+300 - K380+390, K0385+455 - K0385+485, K0385+609 - K385+627

Mountain Province 1st DEO, Cordillera Administrative Region

2020₱22.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF GUINZADAN NHS, BAUKO, MT. PROVINCE 2-STY, 6-CL SCHOOL BLDG.

Mountain Province 1st DEO, Cordillera Administrative Region

2016₱11.1M
Reported complete (DPWH)
No sat.

CY 2018 BEFF BATCH 1: PARACELIS NATIONAL HIGH SCHOOL, 2STY4CL, PARACELIS, MT PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2018₱10.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGKUYO-CHICO RIVER, FENGAR, STA. 33+070 -STA. 33+220(RS), PHASE 2, BONTOC, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2025₱9.7M
Reported complete (DPWH)
View all 40 projects →

4. Implementation

Contract Amount

₱953,187.99

Progress

Reported complete (DPWH)

Start Date

March 3, 2017

Target End

May 3, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceSadangaPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.