Buildings and Facilities22PA0152

CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PANGAL, DANGLAS, ABRA

CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PANGAL, DANGLAS, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱4,947,500.00. Status: Reported complete (DPWH). Contractor on record: BALLIGI CONST DEVELOPMENT CORP FORMERLY:BALLIGI CONST. Figures trace to dpwh.

Abra DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-22-0014818 · ₱8,046,838 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22PA0152 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-14 → 2025-06-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PANGAL, DANGLAS, ABRA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Barangay Poblacion, Baay-Licuan, Abra
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-22-0014818

₱8,046,838.00 · FY2022

Released to Division of Masbate (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

33 projects · ₱385.0M total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL BRIDGE: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF BRIDGE LINKING BRGY. CALIGAYAN TO ANTAGAN 1ST TRAVERSING THE PINACANAUAN DE TUMAUINI

Region II, Region II

2020₱66.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF BONO-BONGAT ROAD, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY - CONSTRUCTION OF REGIONAL HEADQUARTERS BUILDING, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱24.2M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROG.- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES & ECONOMIC ZONES - SAMPAGUITA, PADUL, PATAYA, FURAGUI, BANTAY RD LEADING TO CAG.-APAYAO RD, CARSUMCO, STO. DOMINGO, PIAT, CAG. IN SUPPORT OF SUGARCANE PRO

Cagayan 3rd DEO, Region II

2021₱21.1M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LIKS/NEW ROADS, ABRA-CERVANTES ROAD, ABRA

Abra DEO, Cordillera Administrative Region

2022₱19.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BABALAG WEST-LIWAN WEST-ALIBANGBANG

Lower Kalinga DEO, Cordillera Administrative Region

2024₱19.6M
Past target date (DPWH On-Going)
View all 33 projects →

4. Implementation

Contract Amount

₱4,947,500.00

Progress

Reported complete (DPWH)

Start Date

July 4, 2022

Target End

September 9, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PANGAL, DANGLAS, ABRA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/171a254e-6b1c-4911-b066-098fd2399ed8

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraDanglasPangal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.