Roads21DO0015

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD AT SOUTHVILLE 8B, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD AT SOUTHVILLE 8B, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL is a DPWH-tracked public work in Rizal 2nd DEO, Region IV-A. Reported contract value: ₱14,476,035.07. Status: Reported complete (DPWH). Contractor on record: JOAN AND JOHN CONST AND TRADING. Figures trace to dpwh.

Rizal 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱7,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱416,067,000 · release to the district office, not itemized per project

    Probable match · score 0.92

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21DO0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD AT SOUTHVILLE 8B, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Barangay San Isidro, Rodriguez, Rizal
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱416,067,000.00 · FY2021

Released to Rizal 2nd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

18 projects · ₱405.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY GUITNANGBAYAN II, SA

Rizal 2nd DEO, Region IV-A

2025₱76.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATIONOF ROAD LEADING TO SANI

Rizal 2nd DEO, Region IV-A

2025₱57.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD - K0046+060 - K0047+000, K0048+000 - K0048 +305, K0051+000 - K0052+000

Rizal 2nd DEO, Region IV-A

2024₱56.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD AND DRAINAGE (REI

Rizal 2nd DEO, Region IV-A

2025₱47.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION /IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) AT MARIKINA-INFANTA ROAD KM 0055+400 - K 0058+400 TANAY RIZAL

Rizal 2nd DEO, Region IV-A

2021₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - WIDENING (COMPLETION) OF PERMANENT BRIDGES - TANAY BR. (B02856LZ) SAGBAT-PILILLA DIV. RD

Rizal 2nd DEO, Region IV-A

2022₱28.3M
Reported complete (DPWH)
View all 18 projects →

4. Implementation

Contract Amount

₱14,476,035.07

Progress

Reported complete (DPWH)

Start Date

February 23, 2021

Target End

July 1, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalRodriguezSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.