Roads20D00050

CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION OF BYPASS/ALTERNATE/DIVERSION ROAD-BACOOR BLVD. TO AGUINALDO HIGHWAY (BACOOR-IMUS) CAVITE

CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION OF BYPASS/ALTERNATE/DIVERSION ROAD-BACOOR BLVD. TO AGUINALDO HIGHWAY (BACOOR-IMUS) CAVITE is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱144,749,580.00. Status: Reported complete (DPWH). Contractor on record: I&E CONST CORP FORMERLY: I&E CONSTR. Figures trace to dpwh.

Region IV-A, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2020 GAA. DBM GAA FY2020

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

165 projects · ₱10.9B total · 12 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL NAKAR - DINGALAN ROAD (GEN. NAKAR SIDE), PACKAGE A, QUEZON

Region IV-A, Region IV-A

2022₱289.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITE

Region IV-A, Region IV-A

2025₱280.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITE

Region IV-A, Region IV-A

2025₱280.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS TALON 1 TO TALON 3, LAS PINAS CITY

Las Piñas-Muntinlupa DEO, National Capital Region

2025₱218.3M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BASUD-LANOT ROAD, BASUD,

Region V, Region V

2024₱187.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DAET-SAN VICENTE-SAN LOR

Region V, Region V

2024₱183.3M
Past target date (DPWH On-Going)
View all 165 projects →

4. Implementation

Contract Amount

₱144,749,580.00

Progress

Reported complete (DPWH)

Start Date

October 21, 2020

Target End

August 16, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.