Bridges19PL0036

BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BULO BR. 3 (B02797LZ) ALONG BULO-AGBANNAWAG-CALLAGDAO SECTION, TABUK CITY, KALINGA

BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BULO BR. 3 (B02797LZ) ALONG BULO-AGBANNAWAG-CALLAGDAO SECTION, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱6,366,825.95. Status: Reported complete (DPWH). Contractor on record: WIMREG CONST AND SUPPLY. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0011575 · ₱229,674 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PL0036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-08 → 2025-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES BULO BR. 3 (B02797LZ) ALONG BULO-AGBANNAWAG-CALLAGDAO SECTION, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0011575

₱229,674.00 · FY2019

Released to al Wo Baler National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

29 projects · ₱154.4M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - RIZAL NATL RD (BABALAG-KINAMA-SN FRANCISCO SECT) - K0534 + 029 - K05

Lower Kalinga DEO, Cordillera Administrative Region

2023₱13.0M
Reported complete (DPWH)
No sat.

CONCRETING OF SITIO SAN BASILIO RESETTLEMENT COMMUNITY, BABALAG WEST FMR, BRGY. BABALAG WEST, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱11.9M
Past target date (DPWH On-Going)
No sat.

PACKAGE 1: ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS, RIZAL NATIONAL ROAD (BABALAG-KINAMA-SAN FRANCISCO SECTION) A) K0533+606 - K0533+651, B) K0534+056 - K0534+101 & K0534+

Lower Kalinga DEO, Cordillera Administrative Region

2019₱10.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION MACUTAY-GREENHILLS-SAN PEDRO AND SAN VICENTE ACCESS ROAD LEADING TO ELEPHANT HILL, ARCHEOLOGICAL TOURISM SITE, BRGY. SAN PEDRO (LIWA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱9.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-NAMBARAN-ISABELA ROAD, KO512+000 - KO512+343

Lower Kalinga DEO, Cordillera Administrative Region

2018₱9.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BABALAG WEST - LIWAN WEST - ALIBANGBANG ACCESS ROAD CONNECTING ENRILE - TABUK NATIONAL ROAD AND ALIBANGBANG ACCESS ROAD IN SUPPORT TO VEGGIE NODDLES/CHIPS PROCES

Lower Kalinga DEO, Cordillera Administrative Region

2019₱8.8M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱6,366,825.95

Progress

Reported complete (DPWH)

Start Date

June 13, 2019

Target End

August 26, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukBulo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.