Roads20EA0022

ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, MOGPOG-BALANACAN PORT RD-K0011+000-K0011+400

ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, MOGPOG-BALANACAN PORT RD-K0011+000-K0011+400 is a DPWH-tracked public work in Marinduque DEO, Region IV-B. Reported contract value: ₱16,655,402.74. Status: Reported complete (DPWH). Contractor on record: R R ENCABO CONSTRUCTORS INC FORMERLY RR. Figures trace to dpwh.

Marinduque DEO, Region IV-B
Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-20-0022614 · ₱6,875,373 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20EA0022 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-10-22 → 2015-10-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱41,638,507 per km= 1.5x the Region IV-B median (n=142)

Contract cost ₱16,655,403 ÷ 0.4 km read from the DPWH title (“K0011+000-K0011+400”; K-post / station range length). National percentile: 80. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING  OF DAMAGED PAVED ROADS-SECONDARY ROADS, MOGPOG-BALANACAN PORT RD-K0011+000-K0011+400

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bagtingon Flood Control Buenavista, Marinduque
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-20-0022614

₱6,875,373.00 · FY2020

Released to National Nutrition Council (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

58 projects · ₱3.4B total · 0 flags

Other projects by this contractor

No sat.

LOCALLY FUNDED PROJECT - BUILDING & OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, NAT'L. BUILDING PROGRAMS, CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCL. FENCE (PHASE I), BRGY. MAYAPA, CALAMBA CITY, LAGUNA

Region IV-A, Region IV-A

2017₱210.4M
Reported complete (DPWH)
No sat.

ROAD OPENING OF THE MISSING GAPS AT DR. DAMIAN REYES ROAD (BOAC SIDE), KO30+056.50-KO32+060, BOAC, MARINDUQUE

Region IV-B, Region IV-B

2018₱193.0M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA SOUTH RD - K0036 + 150 - K0036 + 789, K0036 + 845 - K0037 + 623, K0037 + 634 - K0037 + 739, K0038 + 000 - K0038 + 437, K0038 + 735 - K0040 + 962, K0040 + 968 - K0041 + 516

Region IV-A, Region IV-A

2024₱148.3M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECT: CONSTRUCTION OF PROVINCIAL INTEGRATED TRANSPORT TERMINAL AND BUSINESS COMPLEX, CATANDUAN

Region V, Region V

2020₱145.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, BOAC-MOGPOG BY-PASS ROAD, PACKAGE 1, STA. 7+048.00-STA. 8+938.50; STA. 9+168.50-STA. 485.00, MARINDUQUE

Region IV-B, Region IV-B

2022₱144.8M
Past target date (DPWH On-Going)
No sat.

PREVENTIVE MAINTENANCE - SECONDARY ROADS - STA ROSA-ULAT-TAGAYTAY RD - K0045 + 660 - K0046 + 000, K0047 + 380 - K0048 + 565, K0049 + 000 - K0049 + 178

Laguna 2nd DEO, Region IV-A

2025₱133.0M
Past target date (DPWH On-Going)
View all 58 projects →

4. Implementation

Contract Amount

₱16,655,402.74

Progress

Reported complete (DPWH)

Start Date

February 20, 2020

Target End

September 9, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionMarinduqueMogpogIno
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.