R R ENCABO CONSTRUCTORS INC FORMERLY RR is listed as a company organization in Philippine public procurement records on this site, with 58 linked DPWH project(s) totaling about ₱3,397,068,484.34. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
R R ENCABO CONSTRUCTORS INC FORMERLY RR
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 58
- Total value
- ₱3,397,068,484.34
- Published flags
- 0
- Region
- Marinduque DEO · Region IV-B
Public Record Grade
A transparent, data-derived summary of reported public records for R R ENCABO CONSTRUCTORS INC FORMERLY RR — not an accusation or finding of wrongdoing.
Score: 78.40 / 100 · Projects in sample: 58 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 61.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 61.9
- lateCompletedProjects
- 11
- onTimeCompletedProjects
- 36
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 57
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 58
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 58
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 52 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- LOCALLY FUNDED PROJECT - BUILDING & OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, NAT'L. BUILDING PROGRAMS, CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCL. FENCE (PHASE I), BRGY. MAYAPA, CALAMBA CITY, LAGUNA17D00036 · ₱210,369,560.37 · mapped
- ROAD OPENING OF THE MISSING GAPS AT DR. DAMIAN REYES ROAD (BOAC SIDE), KO30+056.50-KO32+060, BOAC, MARINDUQUE18E00060 · ₱193,000,000.00 · mapped
- PREVENTIVE MAINTENANCE - PRIMARY ROADS MANILA SOUTH RD - K0036 + 150 - K0036 + 789, K0036 + 845 - K0037 + 623, K0037 + 634 - K0037 + 739, K0038 + 000 - K0038 + 437, K0038 + 735 - K0040 + 962, K0040 + 968 - K0041 + 51624D00100 · ₱148,275,134.15 · mapped
- LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECT: CONSTRUCTION OF PROVINCIAL INTEGRATED TRANSPORT TERMINAL AND BUSINESS COMPLEX, CATANDUAN20F00052 · ₱145,122,964.31 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, BOAC-MOGPOG BY-PASS ROAD, PACKAGE 1, STA. 7+048.00-STA. 8+938.50; STA. 9+168.50-STA. 485.00, MARINDUQUE22E00002 · ₱144,750,000.00 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - STA ROSA-ULAT-TAGAYTAY RD - K0045 + 660 - K0046 + 000, K0047 + 380 - K0048 + 565, K0049 + 000 - K0049 + 17825DI0019 · ₱132,972,132.00
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES AND LIGHTING FACILITIES ALONG GOV. JJ LINAO ROAD (SO4821LZ), (SO4822LZ), PROVINCE OF BATAAN21C00076 · ₱109,999,086.53 · mapped
- CONSTRUCTION OF BALOGO - KILO-KILO ROAD, STA. CRUZ, MARINDUQUE, PHASE 122EA0137 · ₱98,977,272.93 · mapped
- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BOAC-MOGPOG BY-PASS ROAD, MARINDUQUE24E00002 · ₱97,777,777.77 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, CONSTRUCTION/INSTALLATION OF STREET LIGHTS ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF BATAAN21C00102 · ₱96,494,912.91 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, CONSTRUCTION/INSTALLATION OF STREET LIGHTS ALONG MABATANG VICINAL ROAD (SO1288LZ), PROVINCE OF BATAAN21C00104 · ₱96,491,992.51 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, CONSTRUCTION/INSTALLATION OF STREET LIGHTS ALONG JOSE ABAD SANTOS AVENUE (JASA), PROVINCE OF BATAAN21C00103 · ₱96,483,906.12 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG MARINDUQUE CIRCUMFERENTIAL RD (PACKAGE 3), MARINDUQUE22EA0156 · ₱96,440,513.74 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG MARINDUQUE CIRCUMFERENTIAL RD (PACKAGE 1), MARINDUQUE22EA0154 · ₱96,440,513.74 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG MARINDUQUE CIRCUMFERENTIAL RD (PACKAGE 2), MARINDUQUE22EA0155 · ₱96,440,513.74 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, CONSTRUCTION/INSTALLATION OF STREET LIGHTS ALONG GOV. JJ LINAO ROAD (SO1290LZ), PROVINCE OF BATAAN21C00105 · ₱94,362,746.50 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SAN LORENZO ROAD, PHASE 2, SANTA ROSA CITY, LAGUNA25DI0015 · ₱94,159,836.90 · mapped
- SUSTAINABLE INFRASTRUCTRE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SABO DAM AT MOGPOG RIVER, MOGPOG, MARINDUQUE25E00005 · ₱92,172,578.59 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG TIGWI-DAMPULAN-LIPATA-YOOK-BUENAVISTA RD, MARINDUQUE22EA0157 · ₱67,517,380.41 · mapped
- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0046+704 - K0047+589, K0050+000 - K0050+240, K0050+660 - K0051+32922EA0115 · ₱55,391,662.41 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG BOAC-MOGPOG & BOAC BYPASS ROAD, MARINDUQUE22EA0159 · ₱48,963,026.09 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG DR. DAMIAN REYES RD (BOAC SIDE), MARINDUQUE22EA0147 · ₱48,963,026.09 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG DR. DAMIAN REYES RD (TORRIJOS SIDE), MARINDUQUE22EA0153 · ₱48,963,026.09 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG MOGPOG-BALANACAN PORT RD. MARINDUQUE22EA0146 · ₱48,963,026.09 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, FORT STO. DOMINGO, STA. ROSA, LAGUNA23DI0165 · ₱47,824,000.00
- CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONST. OF POLICE NON-COMMISSIONED OFFICER'S QUARTERING FACILITY, CAMP. EFIGENIO C. NAVARRO, BRGY. SUGUI, CALAPAN CITY, ORIENTAL MINDORO20E00009 · ₱47,766,085.82 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE AT P. DELA CRUZ STREET, (PHASE 3), BARANGAY NAGKAISANG NAYON, QUEZON CITY22OF0188 · ₱47,529,974.53 · mapped
- ROAD WIDENING - SECONDARY ROAD - ROMAN EXPRESSWAY - KO136+300-KO136+958, BATAAN 2ND DISTRICT22CB0007 · ₱47,509,797.39 · mapped
- CONSTRUCTION OF PROVINCIAL INTEGRATED TRANSPORT TERMINAL AND BUSINESS COMPLEX, SAN ISIDRO VILLAGE, VIRAC, CATANDUANES19F00038 · ₱47,230,833.13 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - STA ROSA-ULAT-TAGAYTAY RD - K0047 + 100 - K0047 + 380, K0048 + 565 - K0048 + 74024DI0030 · ₱47,131,696.24 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, MARINDUQ17EA0076 · ₱46,852,410.76 · mapped
- CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, CONST. OF POLICE COMMISSIONED OFFICER'S QUARTERING FACILITY, CAMP EFIGENIO C. NAVARRO, BRGY. SUGUI, CALAPAN CITY, OR. MINDORO20E00008 · ₱45,949,504.65 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SIQUIJOR CIRCUMFERENTIAL RD-K0075+032-K0075+116,K0000+(-199)-K0000+000, K0000+000-K0000+842, K0008+437-K0009+438,K0020+545-K0021+000,K0022+139-K0022+684,K0031+332-K0032+334,K0042+680-K0043+680,K0061+983-K00615HM0101 · ₱45,175,616.52 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, SANTA CRUZ TOWN PLAZA, STA. CRUZ, MARINDUQUE22EA0176 · ₱44,098,000.00 · mapped
- CONCRETING OF ROAD SHOULDER ALONG SIQUIJOR CIRCUMFERENTIAL ROAD INCLUDING SIDEWALK, K0047+000-K0051+00016HM0003 · ₱35,687,148.68 · mapped
- LOCAL INFRA PROGRAM;BUILDING AND OTHER STRUCTURES;MULTI-PURPOSE/FACILITIES: CONST OF MULTI-PURPOSE BUILDING (JOSE LAPID MULTI-PURPOSE GYMNASIUM-PAMPANGA AGRICULTURAL COLLEGE PHASE 2), MAGALANG,PAMPANGA21CI0028 · ₱34,647,586.90 · mapped
- CONSTRUCTION OF EVACUATION CENTER AT BRGY. ZONE I, SOCORRO, ORIENTAL MINDORO17ED0131 · ₱34,214,804.87
- BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (TOURIST REGISTRATION AND BANTAY DAGAT BUILDING), BARANGAY MANIWAYA, SANTA CRUZ, MARINDUQUE25EA0078 · ₱33,130,354.76 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, MOGPOG-BALANACAN PORT RD - K0016+232 - K0016+73221EA0137 · ₱29,396,780.02 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING OF BARANGAY DON JOSE, SANTA ROSA CITY, LAGUNA23DI0147 · ₱29,224,815.23 · mapped
- CONSTRUCTION OF MUNICIPAL HALL OF POLA, POLA, ORIENTAL MINDORO18ED0091 · ₱28,163,746.18 · mapped
- CONSTRUCTION OF 3 STOREY / 15 CLASSROOMS OF SENIOR HIGH SCHOOL @ SAN AGUSTIN NATIONAL HIGH SCHOOL, NAUJAN, ORIENTAL MINDORO16ED0097 · ₱21,268,493.97
- REHABILITATION/RECONSTRUCTION/UPGRADING FOR DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, TIGWI-D17EA0067 · ₱20,709,813.61 · mapped
- REHABILITATION OF ROAD GOING TO DUMPSITE, BRGY. PAYATAS, Q.C.19OF0124 · ₱19,011,584.62 · mapped
- ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-DR. DAMIAN REYES ROAD (BOAC SIDE) - K0023+012 -K0023+07225EA0016 · ₱19,008,755.54 · mapped
- PREVENTIVE MAINTENANCE, MARINDUQUE CIRCUMFERENTIAL ROAD (K0014+886-K0015+250, K0016+000-K0017+000,..17EA0094 · ₱18,913,910.92 · mapped
- REPAIR/MAINTENANCE OF EXISTING REVETMENT, LOOC RIVER, MARIA, SIQUIJOR LONE DISTRICT15HM0105 · ₱18,532,909.97 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE CALAPAN SOUTH ROAD K0016+121 - K0016+980 & K0017+000 - K0017+21017ED0028 · ₱18,152,644.53 · mapped
- ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, MOGPOG-BALANACAN PORT RD-K0011+000-K0011+40020EA0022 · ₱16,655,402.74 · mapped
- RESTORATION OF MALBOG RIVER BANK, (STA.0+087 TO STA. 0+551;STA.0+627.85 TO STA.0+915 LS)17EA0065 · ₱16,614,586.89
Equipment & capacity
PCAB license
- License no.
- 14716
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jan 29, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14716); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
12 evaluations listed across 7 GPPB CPES releases; average final rating 90.8% over 4 rated projects; 12 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Sep 16, 2025 | DOH | ₱304,533,942.00 | On-going | 99.7% | — | 41st, p. 17 |
| Feb 18, 2025 | DPWH | ₱101,320,888.00 | On-going | 95.7% | — | 39th (rev), p. 171 |
| Apr 12, 2024 | NHA | ₱258,882,000.00 | On-going | 90.7% | — | 38th, p. 214 |
| Feb 12, 2024 | NHA | ₱163,925,000.00 | Completed | 83.5% | 83.5% | 38th, p. 214 |
| Nov 17, 2023 | DPWH | ₱49,000,000.00 | Completed | 95.5% | 92.0% | 37th, p. 87 |
| Sep 6, 2023 | DPWH | ₱49,000,000.00 | On-going | 92.4% | — | 36th, p. 166 |
| Aug 7, 2023 | NHA (JV) | ₱421,395,000.00 | Final | 89.3% | 93.8% | 36th, p. 166 |
| Jun 29, 2023 | NHA | ₱258,880,000.00 | On-going | 89.5% | — | 39th (rev), p. 171 |
| May 9, 2023 | DPWH | ₱47,509,797.00 | On-going | 87.4% | — | 36th, p. 166 |
| Mar 8, 2023 | DPWH | ₱47,509,797.00 | On-going | 89.4% | — | 35th, p. 138 |
| Oct 19, 2022 | DPWH (JV) | ₱96,500,000.00 | Completed | 94.0% | 93.9% | 35th, p. 139 |
| Aug 22, 2019 | DPWH | ₱19,600,103.00 | On-going | 88.8% | — | 40th, p. 250 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →