MF02: CONSTRUCTION OF PATA FLOOD CONTROL SYSTEM ALONG SANTIAGO-TUGUEGARAO ROAD (DOWNSTREAM) STA. 0+660-STA. 0+883, PATA, ENRILE, CAGAYAN
MF02: CONSTRUCTION OF PATA FLOOD CONTROL SYSTEM ALONG SANTIAGO-TUGUEGARAO ROAD (DOWNSTREAM) STA. 0+660-STA. 0+883, PATA, ENRILE, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱44,545,489.09. Status: Reported complete (DPWH). Contractor on record: MEGAY CONST INC FORMERLY: MEGAY CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.
No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.
Total Contract Cost

