Roads20DP0029

ASSET PRESERVATION - PREVENTIVE MAINTENANCE -TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0083 + 600 - K0086 + 160

ASSET PRESERVATION - PREVENTIVE MAINTENANCE -TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0083 + 600 - K0086 + 160 is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: REVERE CONST. Figures trace to dpwh.

Laguna 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVI-20-0002899 · ₱296,224 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20DP0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-13 → 2025-02-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱19,140,625 per km= 0.6x the Region IV-A median (n=655)

Contract cost ₱49,000,000 ÷ 2.56 km read from the DPWH title (“K0083 + 600 - K0086 + 160”; K-post / station range length). National percentile: 33. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION - PREVENTIVE MAINTENANCE -TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0083 + 600 - K0086 + 160

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Contstruction of Flood Control Structure, Brgy. Loma, Biñan, Laguna
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVI-20-0002899

₱296,224.00 · FY2020

Released to Corazon Locsin-Montelibano Memorial Regional Hospital (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

118 projects · ₱5.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ALAMINOS - SAN PABLO CITY BYPASS ROAD, PACKAGE J, LAGUNA

Region IV-A, Region IV-A

2024₱301.1M
Past target date (DPWH On-Going)
No sat.

FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, BATANGAS

Region IV-A, Region IV-A

2018₱234.0M
Reported complete (DPWH)
No sat.

MFO-1 NAT'L. ROAD NETWORK SERVICES NETWORK DEV'T. OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE SECONDARY ROADS BATANGAS-QUEZON ROAD, BATANGAS PROVINCE

Region IV-A, Region IV-A

2017₱119.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L. ROADS PREVENTIVE MAINTENANCE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. MGMT.-4 (HDM-4) TERTIARY ROADS BAUAN-MABINI ROAD (S01947LZ), BATANGAS

Region IV-A, Region IV-A

2017₱105.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP), BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW CITY HALL), CITY OF STO. TOMAS, BATANGAS

Batangas 3rd DEO, Region IV-A

2024₱99.0M
Reported complete (DPWH)
No sat.

CSSP - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF A SWIMMING POOL COMPLEX AT THE SAN PABLO CITY SPORTS COMPLEX, BRGY. SAN JOSE, SAN PABLO CITY, LAGUNA

Laguna 3rd DEO, Region IV-A

2023₱99.0M
Reported complete (DPWH)
View all 118 projects →

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

November 20, 2020

Target End

February 17, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaCity of San PabloSanta Isabel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.