Buildings and Facilities18IK0107

CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, TEN (10) CL. SCHOOL BLDG., WRIGHT NHS, WRIGHT, SAMAR

CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, TEN (10) CL. SCHOOL BLDG., WRIGHT NHS, WRIGHT, SAMAR is a DPWH-tracked public work in Samar 2nd DEO, Region VIII. Reported contract value: ₱28,901,775.51. Status: Reported complete (DPWH). Contractor on record: RICHMARK CONST INC FOR:RICHMARK CONST. Figures trace to dpwh.

Samar 2nd DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-18-0031970 · ₱171,788 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18IK0107 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-06-15 → 2024-12-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF MODIFIED DESIGN WITH PARAPET, 1-UNIT, 2-STOREY, TEN (10) CL. SCHOOL BLDG., WRIGHT NHS, WRIGHT, SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Protection Works, Basey, Samar
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-18-0031970

₱171,788.00 · FY2018

Released to Eastern Samar District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

27 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - RPIMARY ROADS - DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR) - K0810+500 - K0813+120, K0813+600 - K0814+500, K0816+000 - K0817+000, K0826+200 - K0827+000, SAMAR 2ND

Region VIII, Region VIII

2024₱197.9M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMGED PAVED ROADS - PRIMARY ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR), CATBALOGAN, PARANAS, HINABANGAN & CALBIGA, SAMAR

Samar 2nd DEO, Region VIII

2023₱107.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ACCESS ROAD FROM BRGY. POLANGI-BRGY. PANAYURAN-BRGY. LITERON LEADING TO LULUGAYAN FALLS, CALBIGA RIVER AND ...... CALBIGA SAMAR

Region VIII, Region VIII

2021₱102.7M
Reported complete (DPWH)
No sat.

CONST. OF ROAD, BONGA - PAMAMAS-AN - LINOOBAN - MARARANGSI - CALUYAHAN, MOTIONG, SAMAR

Samar 2nd DEO, Region VIII

2022₱86.8M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) K0722+200 - K0722+280, K0722+283 - K0722+503, K0723+000 - K0723+470, K0723+700 - K0723+930, K0725+0

Region VIII, Region VIII

2025₱63.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MODIFIED DESIGN WITH PARAPET, 4-STOREY, 20-CL SCHOOL BUILDING, TINGIB E/S, BASEY, SAMAR

Samar 2nd DEO, Region VIII

2019₱50.8M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱28,901,775.51

Progress

Reported complete (DPWH)

Start Date

January 15, 2019

Target End

July 8, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)SamarParanasPoblacion 6
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.