Roads22PE0015

RECONSTRUCTION TO CONCRETE PAVEMENT ALONG SHILAN-BECKEL RD (S000385LZ) - K0262+056-K0262+284.5, K0262+355.5-K0262+780, K0264+925-K0265+943, LA TRINIDAD, BENGUET

RECONSTRUCTION TO CONCRETE PAVEMENT ALONG SHILAN-BECKEL RD (S000385LZ) - K0262+056-K0262+284.5, K0262+355.5-K0262+780, K0264+925-K0265+943, LA TRINIDAD, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱63,690,000.00. Status: Reported complete (DPWH). Contractor on record: JABEN GEN CONTRACTING & ENG'G SERVICES. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-22-0001976 · ₱171,653,146 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱61,890,369 · JABEN GENERAL CONTRACTING AND ENGINEERING SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-09 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱38,114,901 per km= 1.2x the Cordillera Administrative Region median (n=58)

Contract cost ₱63,690,000 ÷ 1.671 km read from the DPWH title (“K0262+056-K0262+284.5; K0262+355.5-K0262+780; K0264+925-K0265+943”; K-post / station range length). National percentile: 76. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RECONSTRUCTION TO CONCRETE PAVEMENT ALONG SHILAN-BECKEL RD (S000385LZ) - K0262+056-K0262+284.5, K0262+355.5-K0262+780, K0264+925-K0265+943, LA TRINIDAD, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure within Naguilian River Basin: along Naguilian River Section 2 (Bolo Creek), La Trinidad, Benguet
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-22-0001976

₱171,653,146.00 · FY2022

Released to Benguet 1st DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Concrete Pavement

₱61,890,368.91 · JABEN GENERAL CONTRACTING AND ENGINEERING SERVICES

Award / contract ref: 22PE0015

Contractor

C

12 projects · ₱910.0M total · 0 flags

Other projects by this contractor

View all 12 projects →

4. Implementation

Contract Amount

₱63,690,000.00

Progress

Reported complete (DPWH)

Start Date

May 10, 2022

Target End

January 13, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetLa TrinidadShilan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.