Buildings and Facilities17DD0271No coordinates published by DPWH

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING AT SAN CARLOS ES, ROSARIO, BATANGAS

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING AT SAN CARLOS ES, ROSARIO, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱9,206,793.19. Status: Reported complete (DPWH). Contractor on record: KENSAL RISE CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0020346 · ₱409,941 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DD0271 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING AT SAN CARLOS ES, ROSARIO, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Revetment with Floodwall along Downstream of Ibaan River, Ibaan, Batangas
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0020346

₱409,941.00 · FY2017

Released to Regional Office - IV (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

84 projects · ₱1.2B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BYPASS ROAD LIPA-MATAAS NA KAHOY PACKAGE A

Batangas 4th DEO, Region IV-A

2023₱93.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0125+152 - K0125+439, K0127+616 - K0130+524

Batangas 4th DEO, Region IV-A

2020₱65.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MABINI ELEMENTARY SCHOOL, BRGY. MABINI, LIPA CITY, BATANGAS

Batangas 4th DEO, Region IV-A

2024₱52.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BRGY. PANSOL-BRGY. MANGGAS, PADRE GARCIA, B

Batangas 4th DEO, Region IV-A

2023₱52.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOMS SCHOOL BUILDING AT SAN JUAN SENIOR HIGH SCHOOL, SAN JUAN, BATANGAS

Batangas 4th DEO, Region IV-A

2017₱41.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY LATAG, LIPA

Batangas 4th DEO, Region IV-A

2025₱37.1M
Ongoing (DPWH-reported)
View all 84 projects →

4. Implementation

Contract Amount

₱9,206,793.19

Progress

Reported complete (DPWH)

Start Date

January 3, 2018

Target End

June 1, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Batangas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.