Buildings and Facilities19BC0271

LOCAL INFRA PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LABLABIG, CLAVERIA, CAGAYAN

LOCAL INFRA PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LABLABIG, CLAVERIA, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱736,813.25. Status: Reported complete (DPWH). Contractor on record: DYLAN EQUIPMENT CONST AND SUPPLIES. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXI-19-0018277 · ₱250,056 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19BC0271 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-16 → 2025-07-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRA PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LABLABIG, CLAVERIA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0018277

₱250,056.00 · FY2019

Released to School (Davao del Sur National High School) 0911230 - Digos City National High (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

51 projects · ₱789.3M total · 0 flags

Other projects by this contractor

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG LAOAG RIVER BASIN, GUISIT RIVER, BRGY. BIMMANGA, PIDDIG, ILOCOS NORTE

Region I, Region I

2023₱82.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS - PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO)-TUAO (CAGAYAN) ROAD, ILOCOS NORTE

Region I, Region I

2022₱72.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LAOAG RIVER BASIN, GUISIT RIVER, SITIO BALBALATE, BARANGAY ABUCAY, PIDDIG, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱65.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MISSING LINKS/NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD, ILOCOS NORTE

Region I, Region I

2022₱53.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)-JCT. MANILA NORTH ROAD TO PINEAPPLE AND S

Cagayan 2nd DEO, Region II

2024₱47.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) DUPITAC-ESTANCIA ROAD LEADING TO SUNFLOWER FARM AND MAMINMINAW FALLS, PIDDIG, ILOCOS NORTE

Ilocos Norte 1st DEO, Region I

2023₱31.1M
Past target date (DPWH On-Going)
View all 51 projects →

4. Implementation

Contract Amount

₱736,813.25

Progress

Reported complete (DPWH)

Start Date

August 29, 2019

Target End

December 11, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanClaveriaUnion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.