GAA 2025 SSP25AC0043

CONSTRUCTION/COMPLETION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM INCLUDING FACILITIES, BARANGAY SABANG, CABUGAO, ILOCOS SUR

CONSTRUCTION/COMPLETION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM INCLUDING FACILITIES, BARANGAY SABANG, CABUGAO, ILOCOS SUR is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱14,800,976.90. Status: Past target date (DPWH On-Going). Contractor on record: FIT CONST. Figures trace to dpwh.

Ilocos Sur 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱15,000

    Probable match · score 0.96

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-25-0001920 · ₱5,286,865 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25AC0043 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2024-04-22 → 2025-05-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/COMPLETION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM INCLUDING FACILITIES, BARANGAY SABANG, CABUGAO, ILOCOS SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 96%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Completion of Flood Mitigation Structures and Drainage System Including Facilities, Barangay Sabang, Cabugao, Ilocos Sur
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-25-0001920

₱5,286,865.00 · FY2025

Released to Mindoro Oriental District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

175 projects · ₱1.7B total · 0 flags

4. Implementation

Contract Amount

₱14,800,976.90

Progress

Past target date (DPWH On-Going)

Start Date

June 11, 2025

Target End

September 7, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos SurCabugaoSabang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.