Buildings and Facilities21BH0090

CONSTRUCTION OF MULTI-PURPOSE BUILDING, QUIMALABASA NORTE ELEMENTARY SCHOOL, BRGY QUIMALABASA

CONSTRUCTION OF MULTI-PURPOSE BUILDING, QUIMALABASA NORTE ELEMENTARY SCHOOL, BRGY QUIMALABASA is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱2,970,000.00. Status: Reported complete (DPWH). Contractor on record: JAY ARCIE CONST AND SUPPLY. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱10,765 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-21-0011670 · ₱9,036,599 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21BH0090 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-05-24 → 2025-05-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, QUIMALABASA NORTE ELEMENTARY SCHOOL, BRGY QUIMALABASA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,765,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure , Quimalabasa Section, San Agustin, Isabela
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-21-0011670

₱9,036,599.00 · FY2021

Released to Southern Leyte State University (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

28 projects · ₱679.7M total · 1 flags

Other projects by this contractor

OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BARANGAY DISTRICT 2 (CONTINUATION), GAMU

Isabela 3rd DEO, Region II

2025₱96.4M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL STRUCTURE, BRGY DISTRICT1

Isabela 3rd DEO, Region II

2025₱96.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DISTRICT 1, LUCBAN, BENITO

Isabela 3rd DEO, Region II

2025₱96.0M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER SACRIFICE VALLEY SECTION PHASE 6A, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2025₱94.5M
Past target date (DPWH On-Going)
No sat.

Construction of Pinacanauan River Flood Control Project, Barangay Marannao, San Mariano, Isabela (Phase 2)

SAN MARIANO (ISABELA), ISABELA, Region II

2024₱71.9M
Reported complete (DPWH)
No sat.

Construction of Pinacanauan River Flood Control Project, Barangay Marannao, San Mariano, Isabela (Phase 1)

SAN MARIANO (ISABELA), ISABELA, Region II

2024₱71.9M
Reported complete (DPWH)
View all 28 projects →

4. Implementation

Contract Amount

₱2,970,000.00

Progress

Reported complete (DPWH)

Start Date

February 23, 2021

Target End

August 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MULTI-PURPOSE BUILDING, QUIMALABASA NORTE ELEMENTARY SCHOOL, BRGY QUIMALABASA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/1e8515be-3ac2-460c-981d-f82447415b71

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaSan AgustinQuimalabasa Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.