Roads17AA0224No coordinates published by DPWH

CONCRETING OF BUCANA TO VISAYA ROAD, VINTAR, ILOCOS NORTE

CONCRETING OF BUCANA TO VISAYA ROAD, VINTAR, ILOCOS NORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱48,999,461.15. Status: Reported complete (DPWH). Contractor on record: VIKING CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region I

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱13,500 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0017541 · ₱1,955,200 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17AA0224 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-01 → 2025-09-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BUCANA TO VISAYA ROAD, VINTAR, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱13,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Vintar Flood Control, Brgy. 1, San Roque, Vintar, Ilocos Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0017541

₱1,955,200.00 · FY2017

Released to Regional Office - VI (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

226 projects · ₱7.7B total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MANILA NORTH ROAD K0524+564-K0526+321, K0555+000-K0555+896; K0556+047-K0557+100; K0561+000-K0561+122; K0563+556-K0564+000; K0526+321-K0526+469; K0555+000-K0555+158; K0555+1

Region I, Region I

2018₱190.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD, PACKAGE 2, CAGAYAN

Region II, Region II

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD (TUGUEGARAO-SOLANA BRIDGE AND APPROACHES)-PHASE 1

Region II, Region II

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-ENRILE DIVERSION RD (INCL. TUGUEGARAO-ENRILE BRIDGE AND APPROACHES) PHASE 1

Region II, Region II

2023₱186.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, PANCIAN, PAGUDPUD - ADAMS ROAD LEADING TO DIFFERENT WATERFALLS ADAMS, ILOCOS NORTE

Region I, Region I

2016₱147.9M
Reported complete (DPWH)
No sat.

OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM : ASSET PRESERVATION- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - CAGAYAN VALLEY ROAD (MAGAPIT-JCT. APARRI AIRPORT SECTION), K0575+000 - K0580+000,CAMALANIUGAN

Region II, Region II

2018₱126.4M
Reported complete (DPWH)
View all 226 projects →

4. Implementation

Contract Amount

₱48,999,461.15

Progress

Reported complete (DPWH)

Start Date

June 12, 2017

Target End

January 21, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteVintar
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.