Roads24FF0039

001;ASSET PRESERVATION PROG.-PREVENTIVE MAINT.-SECONDARY ROADS-PILI TIGAON -ALBAY BOUNDARY ROAD-KO457+000-KO457+054,KO457+085-KO459+323,KO459+355.13-KO460+095.40 OCAMPO CAMARINES SUR

001;ASSET PRESERVATION PROG.-PREVENTIVE MAINT.-SECONDARY ROADS-PILI TIGAON -ALBAY BOUNDARY ROAD-KO457+000-KO457+054,KO457+085-KO459+323,KO459+355.13-KO460+095.40 OCAMPO CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 3rd DEO, Region V. Reported contract value: ₱58,314,051.10. Status: Reported complete (DPWH). Contractor on record: NFH CONST. Figures trace to dpwh.

Camarines Sur 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROV-24-0006883 · ₱23,392,202 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24FF0039 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-12-06 → 2022-12-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 001;ASSET PRESERVATION PROG.-PREVENTIVE MAINT.-SECONDARY ROADS-PILI TIGAON -ALBAY BOUNDARY ROAD-KO457+000-KO457+054,KO457+085-KO459+323,KO459+355.13-KO460+095.40 OCAMPO CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay Sua, Canaman, Camarines Sur
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-24-0006883

₱23,392,202.00 · FY2024

Released to Camarines Sur 3rd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

123 projects · ₱5.3B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-MABOLO-ALMEDA BYPASS ROAD, NAGA CITY, CAMARINES SUR 3RD LEGISLATIVE DISTRICT

Region V, Region V

2021₱226.8M
Reported complete (DPWH)
No sat.

CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. MORNING, CATAINGAN-ESPERANZA PORT ROAD, PIO V. CORPUZ AND ESPERANZA, MASBATE 3RD LD

Region V, Region V

2016₱202.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR EXPRESSWAY PACKAGE 7, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLATIVE DISTRICT)

Region V, Region V

2023₱193.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS -NASUGBU-LIAN-CALATAGAN RD (S05012LZ) - K0113 + 600 - K0114 + 000, K0115 + 000 - K0116 + 400

Batangas 1st DEO, Region IV-A

2024₱144.8M
Reported complete (DPWH)
No sat.

CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ROAD UPGRADING (GRAVEL TO CONCRETE) OF SAN JUAN-ALAS-TAGPU-DAYAO ROAD LEADING TO MANDAON ECOTOURISM SITES, MANDAON, MASBATE PROVINCE

Region V, Region V

2016₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO283+040 - KO292+200 WITH EXCEPTIONS, CAMARINES NORTE

Region V, Region V

2016₱142.9M
Reported complete (DPWH)
View all 123 projects →

4. Implementation

Contract Amount

₱58,314,051.10

Progress

Reported complete (DPWH)

Start Date

April 5, 2024

Target End

December 1, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurOcampoCagmanaba
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.