GAA 2024 SSP24ID0070

CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING BARANGAY PONONG,CARIGARA,LEYTE

CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING BARANGAY PONONG,CARIGARA,LEYTE is a DPWH-tracked public work in Leyte 2nd DEO, Region VIII. Reported contract value: ₱2,960,492.75. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: K M GOLONG CONST. Figures trace to dpwh.

Leyte 2nd DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXII-24-0006536 · ₱2,500,000 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24ID0070 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2024-02-09 → 2024-02-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING BARANGAY PONONG,CARIGARA,LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay 1, Jaro, Leyte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXII-24-0006536

₱2,500,000.00 · FY2024

Released to Leyte 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

37 projects · ₱372.1M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF MULTI-PURPOSE FACILITY, MAC ARTHUR,LEYTE

Leyte 2nd DEO, Region VIII

2024₱49.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0153+490 - K0153+566, VALLEHERMOSO

Negros Oriental 1st DEO, Negros Island Region

2023₱29.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS VALLEHERMOSO - CANLAON CITY - LA - CASTELLANA RD VALLEHERMOSO, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2021₱21.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS-DUMAGUETE NORTH RD (JCT. BAIS-KABANKALAN-NEGROS OCC BDRY) - K0053+350-K0053+700, K0053+800-K

Negros Oriental 1st DEO, Negros Island Region

2023₱21.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/COMPLETION OF 1 UNIT 2 STOREY 6 CLASSROOM SCHOOL BUILDING AT AGUTAYON ES, JIMALALUD, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2021₱18.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0153+393-K0153+490, K0153+735-K015

Negros Oriental 1st DEO, Negros Island Region

2023₱18.4M
Reported complete (DPWH)
View all 37 projects →

4. Implementation

Contract Amount

₱2,960,492.75

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 31, 2024

Target End

December 6, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteCarigara
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.