Roads24LF0144

CONSTRUCTION OF ROAD ALONG SURIGAO DEL SUR BOUNDARY-DAVAO ORIENTAL COASTAL ROAD-K1652+000-K1655+000, TAGTALISAY, MANAY, DAVAO ORIENTAL

CONSTRUCTION OF ROAD ALONG SURIGAO DEL SUR BOUNDARY-DAVAO ORIENTAL COASTAL ROAD-K1652+000-K1655+000, TAGTALISAY, MANAY, DAVAO ORIENTAL is a DPWH-tracked public work in Davao Oriental 1st DEO, Region XI. Reported contract value: ₱98,994,585.32. Status: Past target date (DPWH On-Going). Contractor on record: GTM BUILDERS & SUPPLY. Figures trace to dpwh.

Davao Oriental 1st DEO, Region XI
Region: Region XI

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-24-0009263 · · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱98,002,185 · ECBJ EAST COAST CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    86% reported · imagery 2019-05-25 → 2025-05-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱32,998,195 per km= 1.6x the Region XI median (n=48)

Contract cost ₱98,994,585 ÷ 3 km read from the DPWH title (“K1652+000-K1655+000”; K-post / station range length). National percentile: 64. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD ALONG SURIGAO DEL SUR BOUNDARY-DAVAO ORIENTAL COASTAL ROAD-K1652+000-K1655+000, TAGTALISAY, MANAY, DAVAO ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure Protecting Surigao del Sur Boundary - Davao Oriental Coastal Road ( Dapnan Bridge ) , Baganga, Davao Oriental
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0009263

₱0.00 · FY2024

Released to Division of Kidapawan City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24LF0144

₱98,002,185.45 · ECBJ EAST COAST CONSTRUCTION

Award / contract ref: 24LF0144

Contractor

D

6 projects · ₱520.6M total · 0 flags

4. Implementation

Contract Amount

₱98,994,585.32

Progress

Past target date (DPWH On-Going)

Start Date

May 6, 2024

Target End

April 14, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OrientalManayCentral
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.