Flood Control and Drainage17CL0102No coordinates published by DPWH

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG AGNO RIVER, STA. RITA-TINANTAPI, MA

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG AGNO RIVER, STA. RITA-TINANTAPI, MA is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱10,936,243.05. Status: Reported complete (DPWH). Contractor on record: E R DELA CRUZ CONST. Figures trace to dpwh.

Zambales 1st DEO, Region III

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region III

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0022649 · ₱7,844 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17CL0102 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG AGNO RIVER, STA. RITA-TINANTAPI, MA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection/ Flood Control, Lipay River Control, Sta. Cruz, Zambales
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0022649

₱7,844.00 · FY2017

Released to Pablo Lorenzo National High School (Mandug National High School) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱10,936,243.05

Progress

Reported complete (DPWH)

Start Date

July 17, 2017

Target End

November 13, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Zambales
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.