Buildings and Facilities22JH0027

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUMAGDANG, ISABELA CITY, BASILAN

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUMAGDANG, ISABELA CITY, BASILAN is a DPWH-tracked public work in Isabela City DEO, Region IX. Reported contract value: ₱14,846,843.25. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: RR-JAM CONST. Figures trace to dpwh.

Isabela City DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-F-22-0004910 · · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱14,846,843 · RR-JAM CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-08 → 2025-01-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUMAGDANG, ISABELA CITY, BASILAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System, Barangay Carabatan Chica, Cauayan City, Isabela
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-F-22-0004910

₱-391,688.00 · FY2022

Released to Diliman Campus (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID 22JH0027

₱14,846,843.25 · RR-JAM CONSTRUCTION

Award / contract ref: 22JH0027

Contractor

D

23 projects · ₱395.7M total · 0 flags

Other projects by this contractor

No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LANDANG GUA, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2025₱47.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PASILMANTA, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2025₱47.6M
Past target date (DPWH On-Going)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SIRATANG-SUBAH MAMAH, LANGUYAN, TAWI-TAWI

Region IX, Region IX

2024₱33.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF THREE (3) STORY NINE (9) CLASSROOM SCHOOL BUILDING AT LUMBANGAN ELEMENTARY SCHOOL, BARANGAY LUMBANGAN, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2023₱29.7M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT OF ROAD, BARANGAY MARANG-MARANG TO BRGY. LUKBUTON, ISABELA CITY, BASILAN

Isabela City DEO, Region IX

2023₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BRGY. LUKBUTON TO BRGY. PANIGAYAN LEADING TO WHITE BEACH, MALAMAWI ISLAND, ISABELA CITY, BASILAN

Region IX, Region IX

2023₱27.9M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱14,846,843.25

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 21, 2022

Target End

November 15, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)City of IsabelaSumagdang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.