CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALANDOK RIVER (UPSTREAM) STA. 0+000.00 - STA. 0+400.00, LEON B. POSTIGO, ZAMBOANGA DEL NORTE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALANDOK RIVER (UPSTREAM) STA. 0+000.00 - STA. 0+400.00, LEON B. POSTIGO, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 3rd DEO, Region IX. Reported contract value: ₱95,037,218.23. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: EDANNA CONST. Figures trace to dpwh.
Total Contract Cost


