Roads20CC0097

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - GENERAL ALEJO SANTOS HIGHWAY K0047+259 - K0048+872, BUSTOS, BULACAN

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - GENERAL ALEJO SANTOS HIGHWAY K0047+259 - K0048+872, BUSTOS, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱14,705,423.59. Status: Reported complete (DPWH). Contractor on record: L P O ENT. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱18,576 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-20-0007526 · ₱1,558,081 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱14,705,424 · L.P.O. ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-25 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱9,116,816 per km= 0.3x the Region III median (n=352)

Contract cost ₱14,705,424 ÷ 1.613 km read from the DPWH title (“K0047+259 - K0048+872”; K-post / station range length). National percentile: 9. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - GENERAL ALEJO SANTOS HIGHWAY K0047+259 - K0048+872, BUSTOS, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱18,576,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Mitigation Facilities along Major River Basins (Angat River), Cambaog-Talampas Section, Bustos, Bulacan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-20-0007526

₱1,558,081.00 · FY2020

Released to Muntinlupa Business High School (Pedro E. Diaz High School-Buli Annex) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

General Alejo Santos Highway K0047+259 – K0048+872

₱14,705,423.59 · L.P.O. ENTERPRISES

Award / contract ref: 20CC0097

Contractor

B

160 projects · ₱2.0B total · 0 flags

4. Implementation

Contract Amount

₱14,705,423.59

Progress

Reported complete (DPWH)

Start Date

November 23, 2020

Target End

January 6, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanPlaridelCulianin
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.