Construction of Flood Mitigation Structure22K00294

Construction of Flood Control along Pagayawan Road, Barangay Banago, Balabagan, Lanao de Sur

Construction of Flood Control along Pagayawan Road, Barangay Banago, Balabagan, Lanao de Sur is a DPWH-tracked public work in BALABAGAN (LANAO DEL SUR), LANAO DEL SUR, Region X. Reported contract value: ₱6,860,609.84. Status: Reported complete (DPWH). Contractor on record: TESAR BUILDERS. Figures trace to sumbong.

BALABAGAN (LANAO DEL SUR), LANAO DEL SUR, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱7,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-22-0013666 · ₱6,300 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱6,860,610 · TESAR BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-05 → 2025-09-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Low flood hazard · Lanao del Sur

Based on the coordinates published with the DPWH record and NOAH file LanaoDelSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control along Pagayawan Road, Barangay Banago, Balabagan, Lanao de Sur

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Pagayawan Road, Barangay Banago, Balabagan, Lanao de Sur
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-22-0013666

₱6,300.00 · FY2022

Released to Division of Davao del Sur (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22K00294

₱6,860,609.84 · TESAR BUILDERS

Award / contract ref: 22K00294

Contractor

B

127 projects · ₱538.7M total · 0 flags

Other projects by this contractor

View all 127 projects →

4. Implementation

Contract Amount

₱6,860,609.84

Progress

Reported complete (DPWH)

Start Date

June 29, 2022

Target End

October 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Bangsamoro Autonomous Region In Muslim Mindanao (BARMM)Lanao del SurBalabaganLorenzo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.