Roads21KC0098

ROAD WIDENING ALONG SAYRE HIGHWAY K1438+353-K1439+463, MANOLO FORTICH, BUKIDNON

ROAD WIDENING ALONG SAYRE HIGHWAY K1438+353-K1439+463, MANOLO FORTICH, BUKIDNON is a DPWH-tracked public work in Bukidnon 3rd DEO, Region X. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: RITCHE-NATHALIE BUILDERS. Figures trace to dpwh.

Bukidnon 3rd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVA-21-0008181 · ₱541,626,000 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21KC0098 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-09 → 2025-07-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Unit-cost benchmark · Road, cost per km (widening)

₱44,144,144 per km= 1.2x the Region X median (n=383)

Contract cost ₱49,000,000 ÷ 1.11 km read from the DPWH title (“K1438+353-K1439+463”; K-post / station range length). National percentile: 76. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING ALONG SAYRE HIGHWAY K1438+353-K1439+463, MANOLO FORTICH, BUKIDNON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Jct Maradugao-Camp Kibaritan-Dominorog Road (Upstream and Downstream) of Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVA-21-0008181

₱541,626,000.00 · FY2021

Released to Batangas 3rd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

47 projects · ₱2.2B total · 0 flags

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

March 22, 2021

Target End

December 21, 2021

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 18 Delayed/Non-submission of Contracts, Purchase Orders (POs) and supporting documents). DPWH's action-plan response to this observation names Contract ID 21KC0098, p. 344. Excerpt: "21KC0098 May 06, 2022 21KC0093 June 15, 2022 21KC0092 February 07, 2022 22KC0084 August 16, 2022"

CY2023 · p.344

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonManolo FortichAlae
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.