Roads16BD0068No coordinates published by DPWH

CONSTRUCTION OF FARM TO MILL ROAD, BRGY. SAMPAGUITA-BANTAY, SOLANA, CAGAYAN, STA. 0+000-STA. 0+35.38, STA. 0+40.70-STA. 0+119, STA. 0+305.09-STA. 0+854.21, STA. 1+354.03-STA. 1+805.33, STA. 2+497.04-STA. 3+892

CONSTRUCTION OF FARM TO MILL ROAD, BRGY. SAMPAGUITA-BANTAY, SOLANA, CAGAYAN, STA. 0+000-STA. 0+35.38, STA. 0+40.70-STA. 0+119, STA. 0+305.09-STA. 0+854.21, STA. 1+354.03-STA. 1+805.33, STA. 2+497.04-STA. 3+892 is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱27,125,420.76. Status: Reported complete (DPWH). Contractor on record: TECKCON CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-16-0012658 · ₱3,968,267 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16BD0068 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-08-31 → 2020-07-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱10,810,817 per km= 1.3x the Region II median (n=86)

Contract cost ₱27,125,421 ÷ 2.509 km read from the DPWH title (“STA. 0+000-STA. 0+35.38; STA. 0+40.70-STA. 0+119; STA. 0+305.09-STA. 0+854.21; STA. 1+354.03-STA. 1+805.33; STA. 2+497.04-STA. 3+892”; K-post / station range length). National percentile: 18. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FARM TO MILL ROAD, BRGY. SAMPAGUITA-BANTAY, SOLANA, CAGAYAN, STA. 0+000-STA. 0+35.38, STA. 0+40.70-STA. 0+119, STA. 0+305.09-STA. 0+854.21, STA. 1+354.03-STA. 1+805.33, STA. 2+497.04-STA. 3+892

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System, Caggay, Tuguegarao City, Cagayan 3rd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0012658

₱3,968,267.00 · FY2016

Released to Soccsksargen Centers for Health Development To (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

24 projects · ₱221.8M total · 0 flags

Other projects by this contractor

No sat.

NATIONAL BUILDING PROGRAM - MULTIPURPOSE/FACILITIES - STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS/QUARANTINE FACILITIES - CAR, CONSTRUCTION OF EVACUATION CENTER AT POBLACION, KABUGAO, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2021₱35.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOLANA DIVERSION ROAD PHASE II, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱34.1M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF BUNOT FLOOD CONTROL, PARACELIS, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2020₱24.2M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURES-CONSTRUCTION OF KATAO FLOOD CONTROL, PARACELIS, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2020₱24.1M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF VARIOUS LOCAL ROADS AND DRAINAGES IN MUNICIPALITY OF SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2021₱12.4M
Reported complete (DPWH)
No sat.

REPAIR/IMRPOVEMENT OF SUKIAP-TANGLAG - LUBUAGAN ROAD FROM STA 0+000-STA KM2+150, LUBUAGAN, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2016₱9.6M
Reported complete (DPWH)
View all 24 projects →

4. Implementation

Contract Amount

₱27,125,420.76

Progress

Reported complete (DPWH)

Start Date

October 18, 2016

Target End

April 20, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSolana
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.