TECKCON CONST is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱221,848,125.08. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
TECKCON CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱221,848,125.08
- Published flags
- 0
- Region
- Cagayan 3rd DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- Joel Lasegan Teckney · Authorized Managing Officer (PCAB license 33214) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TECKCON CONST — not an accusation or finding of wrongdoing.
Score: 79.50 / 100 · Projects in sample: 24 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 69.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 69.6
- lateCompletedProjects
- 10
- onTimeCompletedProjects
- 11
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 22
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 24
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 24
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 24
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
18 geotagged projects — Open full map · Download projects (CSV)
- NATIONAL BUILDING PROGRAM - MULTIPURPOSE/FACILITIES - STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS/QUARANTINE FACILITIES - CAR, CONSTRUCTION OF EVACUATION CENTER AT POBLACION, KABUGAO, APAYAO21PB0021 · ₱35,705,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOLANA DIVERSION ROAD PHASE II, SOLANA, CAGAYAN24BD0170 · ₱34,131,653.05 · mapped
- CONSTRUCTION OF FARM TO MILL ROAD, BRGY. SAMPAGUITA-BANTAY, SOLANA, CAGAYAN, STA. 0+000-STA. 0+35.38, STA. 0+40.70-STA. 0+119, STA. 0+305.09-STA. 0+854.21, STA. 1+354.03-STA. 1+805.33, STA. 2+497.04-STA. 3+89216BD0068 · ₱27,125,420.76
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF BUNOT FLOOD CONTROL, PARACELIS, MOUNTAIN PROVINCE20PM0019 · ₱24,207,427.94 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURES-CONSTRUCTION OF KATAO FLOOD CONTROL, PARACELIS, MOUNTAIN PROVINCE20PM0020 · ₱24,058,050.00 · mapped
- LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF VARIOUS LOCAL ROADS AND DRAINAGES IN MUNICIPALITY OF SOLANA, CAGAYAN21BD0106 · ₱12,375,000.00 · mapped
- REPAIR/IMRPOVEMENT OF SUKIAP-TANGLAG - LUBUAGAN ROAD FROM STA 0+000-STA KM2+150, LUBUAGAN, KALINGA16PL0012 · ₱9,593,024.56
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MAPACO, BOGTOY ALLANGIGAN, SAN FELIPE, UBBOG, BA25PL0051 · ₱6,923,444.39 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, DILAG, GOBGOB, GREEN HILLS ACCESS ROAD, BARANGAY DI25PL0046 · ₱4,874,350.78 · mapped
- LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, NIA ROAD, BARANGAY LANNA, SOLANA, CAGAYAN21BD0018 · ₱4,800,415.83 · mapped
- LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, BARANGAY BALAO, SOLANA, CAGAYAN21BD0017 · ₱4,794,250.94 · mapped
- CONCRETING OF CAGAYAN BREEDING STATION ROAD NETWORK, BRGY. MAGUIRIG, SOLANA, CAGAYAN17BD0105 · ₱4,775,081.71
- CONSTRUCTION OF AUTOMOTIVE SERVICING BC II LABORATORY, KALINGANATIONAL HIGH SCHOOL17PL0098 · ₱4,261,927.50
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY CENTRO NORTHWEST, SOLANA, CAGAYAN22BD0031 · ₱3,920,000.00 · mapped
- ELECTRICAL INSTALLATION MAINTENANCE (TECHVOC BUILDING) KALINGANATIONAL HIGH SCHOOL17PL0096 · ₱3,254,212.29
- CONSTRUCTION OF COMMERCIAL COOKING NCII (TECHVOC BUILDING)17PL0097 · ₱2,824,968.89
- CONSTRUCTION OF CONCRETE ROAD, BRGYS. CADAANAN AND LANNIG, SOLANA, CAGAYAN18BD0022 · ₱1,931,602.20 · mapped
- CONCRETING OF ROAD, BRGYS. CADAANAN-LANNIG, SOLANA, CAGAYAN18BD0023 · ₱1,928,987.82 · mapped
- LIP: ROAD CONCRETING, BRGY. FURAGUI, BRGY. FURAGUI, SOLANA, CAGAYAN 3RD LD17BD0006 · ₱1,899,991.56 · mapped
- CONCRETING OF PADUL FMR, PADUL, SOLANA, CAGAYAN17BD0099 · ₱1,889,941.94 · mapped
- CONSTRUCTION (COMPLETION) OF SAN VICENTE MULLTI PURPOSE-BUILDING18PL0029 · ₱1,885,540.52 · mapped
- LOCAL PROGRAM - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - ROAD CONCRETING OF LOCAL ROAD, BRGY. PAROG-PAROG, SOLANA, CAGAYAN19BD0012 · ₱1,880,760.80 · mapped
- LIP - CONCRETING OF BADUYEN STREET, MAGSAYSAY, TABUK CITY, KALINGA18PL0047 · ₱1,866,571.27 · mapped
- CONSTRUCTION OF MAGSAYSAY MULTI-PURPOSE BUILDING18PL0038 · ₱940,500.33 · mapped
Equipment & capacity
PCAB license
- License no.
- 33214
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jun 10, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 33214); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 2 GPPB CPES releases; average final rating 86.6% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 17, 2023 | DPWH | ₱12,375,000.00 | Completed | 88.4% | 86.6% | 35th, p. 170 |
| Jul 4, 2022 | DPWH | ₱12,375,000.00 | On-going | 85.4% | — | 34th, p. 84 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →