Buildings and Facilities18HM0007

CLUSTER III: 1. CONSTRUCTION OF MULTI-PUROSE BUILDING, BRGY. BASAC, LARENA; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BINTANGAN, LARENA; 3. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANDIGUM, LARENA; 4. CONSTRUCTION OF MULTI-PURPOSE BUILDING, B

CLUSTER III: 1. CONSTRUCTION OF MULTI-PUROSE BUILDING, BRGY. BASAC, LARENA; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BINTANGAN, LARENA; 3. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANDIGUM, LARENA; 4. CONSTRUCTION OF MULTI-PURPOSE BUILDING, B is a DPWH-tracked public work in Siquijor DEO, Negros Island Region. Reported contract value: ₱9,410,767.31. Status: Reported complete (DPWH). Contractor on record: ALOJA BUILDERS AND REALTY. Figures trace to dpwh.

Siquijor DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱46,805 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-18-0006349 · ₱5,776,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HM0007 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-07 → 2015-02-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER III: 1. CONSTRUCTION OF MULTI-PUROSE BUILDING, BRGY. BASAC, LARENA; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BINTANGAN, LARENA; 3. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CANDIGUM, LARENA; 4. CONSTRUCTION OF MULTI-PURPOSE BUILDING, B

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱46,805,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures/Shore Protection at Looc-Cantaroc A, Maria, Siquijor
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-18-0006349

₱5,776,000.00 · FY2018

Released to Siquijor DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

172 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS AT SITIO CANTUGOP, NAPO TO BRGY. PUTLONGCAM, ALICIA, BOHOL ST. 0+000.00 - STA.3+202.90 WITH EXCEPTION - SECTION 1; STA. 2+065.00 - STA. 2+365 - SECT

Bohol 3rd DEO, Region VII

2020₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION (CONCRETING) OF ROAD AT BRGY. WEST CANAYAON TO BRGY. CAL

Bohol 3rd DEO, Region VII

2023₱39.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. BINLOD BARANGAY ROAD, ARGAO, CEBU

Cebu 2nd DEO, Region VII

2025₱39.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION (CONCRETING) OF ROAD AT BARANGAY BUGANG SUR TO BARANGAY C

Bohol 3rd DEO, Region VII

2023₱34.6M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, VALENCIA, BOHOL, SEC. 1: STA. 0+000.00 - STA

Bohol 3rd DEO, Region VII

2024₱34.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES - SECONDARY ROADS, TAGB. EAST ROAD (TAGB.-JAGNA), JAGNA, BOHOL K0193+620.00 - K0193+6

Bohol 3rd DEO, Region VII

2021₱28.1M
Reported complete (DPWH)
View all 172 projects →

4. Implementation

Contract Amount

₱9,410,767.31

Progress

Reported complete (DPWH)

Start Date

February 21, 2018

Target End

June 30, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)SiquijorLarenaBintangan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.