CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, 1.) R-PSB MALITA CLUSTER 2 (SITIO GUISOK), 2.) TFS TUBALAN ELEMENTARY SCHOOL (BRGY. TUBALAN), 3.) MARTINO MASIWEL NATIONAL HIGH SCHOOL (BRGY. PANGLEON), 4.) LIBUDON ELEME
CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM (RWCS) STAINLESS STEEL HORIZONTAL TANK, 1.) R-PSB MALITA CLUSTER 2 (SITIO GUISOK), 2.) TFS TUBALAN ELEMENTARY SCHOOL (BRGY. TUBALAN), 3.) MARTINO MASIWEL NATIONAL HIGH SCHOOL (BRGY. PANGLEON), 4.) LIBUDON ELEME is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱2,603,457.36. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: WOLFRAM TRADE BUILDERS. Figures trace to dpwh.
Total Contract Cost