Buildings and Facilities19DJ0076

CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEARNING RESOURCE CENTER), TIAONG, QUEZON

CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEARNING RESOURCE CENTER), TIAONG, QUEZON is a DPWH-tracked public work in Quezon 2nd DEO, Region IV-A. Reported contract value: ₱6,930,000.00. Status: Reported complete (DPWH). Contractor on record: MEGA M BUILDERS CORP FORMERLY: MEGA M BUILDERS. Figures trace to dpwh.

Quezon 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DJ0076 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-13 → 2025-01-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (LEARNING RESOURCE CENTER), TIAONG, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

154 projects · ₱3.0B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCL. ROW TIAONG BY-PASS ROAD, ROAD AND BRIDGE WIDENING, QUEZON 2ND L.D., QUEZON PROVINCE

Quezon 2nd DEO, Region IV-A

2017₱144.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. ROSA RIVER (NEAR TRUSS BRIDGE), STO. DOMINGO SIDE, SANTA ROSA, LAGUNA

Laguna 2nd DEO, Region IV-A

2024₱93.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BARANGAY PASONG CAMACHILE,PHASE I,

Cavite 1st DEO, Region IV-A

2024₱86.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BARANGAY PASONG CAMACHILE,PHASE II,

Cavite 1st DEO, Region IV-A

2024₱85.9M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0099 + 240 - K0099 + 828, K0099 + 841.80 - K0100 + 389

Laguna 3rd DEO, Region IV-A

2022₱78.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - LIPA CITY - ALAMINOS RD - K0080 + 482 - K0081 + 409, K0081 + 781 - K0082 + 282

Laguna 3rd DEO, Region IV-A

2021₱72.4M
Reported complete (DPWH)
View all 154 projects →

4. Implementation

Contract Amount

₱6,930,000.00

Progress

Reported complete (DPWH)

Start Date

December 23, 2019

Target End

August 18, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonTiaongLumingon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.