Buildings and Facilities16DP0045No coordinates published by DPWH

REHABILITATION/EXPANSION OF RHU, CALAUAN RHU, CALAUAN, LAGUNA 3RD LD

REHABILITATION/EXPANSION OF RHU, CALAUAN RHU, CALAUAN, LAGUNA 3RD LD is a DPWH-tracked public work in Laguna 3rd DEO, Region IV-A. Reported contract value: ₱1,473,499.60. Status: Reported complete (DPWH). Contractor on record: MEGA M BUILDERS CORP FORMERLY: MEGA M BUILDERS. Figures trace to dpwh.

Laguna 3rd DEO, Region IV-A

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region IV-A

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIX-16-0030618 · ₱655,280 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16DP0045 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/EXPANSION OF RHU, CALAUAN RHU, CALAUAN,  LAGUNA 3RD LD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Construction of Flood Control Structure (Upstream and Downstream) of Malaunod Bridge, San Pablo City, Laguna 3rd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIX-16-0030618

₱655,280.00 · FY2016

Released to Zamboanga Sibugay National High School (Pangi Re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

154 projects · ₱3.0B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCL. ROW TIAONG BY-PASS ROAD, ROAD AND BRIDGE WIDENING, QUEZON 2ND L.D., QUEZON PROVINCE

Quezon 2nd DEO, Region IV-A

2017₱144.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. ROSA RIVER (NEAR TRUSS BRIDGE), STO. DOMINGO SIDE, SANTA ROSA, LAGUNA

Laguna 2nd DEO, Region IV-A

2024₱93.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BARANGAY PASONG CAMACHILE,PHASE I,

Cavite 1st DEO, Region IV-A

2024₱86.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BARANGAY PASONG CAMACHILE,PHASE II,

Cavite 1st DEO, Region IV-A

2024₱85.9M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SN PABLO-RIZAL-NAGCARLAN-LILIW RD - K0099 + 240 - K0099 + 828, K0099 + 841.80 - K0100 + 389

Laguna 3rd DEO, Region IV-A

2022₱78.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - LIPA CITY - ALAMINOS RD - K0080 + 482 - K0081 + 409, K0081 + 781 - K0082 + 282

Laguna 3rd DEO, Region IV-A

2021₱72.4M
Reported complete (DPWH)
View all 154 projects →

4. Implementation

Contract Amount

₱1,473,499.60

Progress

Reported complete (DPWH)

Start Date

November 3, 2016

Target End

March 2, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)LagunaCalauan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.