Roads15BC0167

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS,SEAPORTS & DECLARED TOURISM DESTINATIONS: CONCRETING/IMPROVEMENT OF MAGSIDEL PORT-CALAYAN,POBLACION-SIBANG COVE ROAD,CALAYAN,CAGAYAN LEADING TO SIBANG COVE,CARARANGATAN CAVE,SIBANG CAVE,CALABA

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS,SEAPORTS & DECLARED TOURISM DESTINATIONS: CONCRETING/IMPROVEMENT OF MAGSIDEL PORT-CALAYAN,POBLACION-SIBANG COVE ROAD,CALAYAN,CAGAYAN LEADING TO SIBANG COVE,CARARANGATAN CAVE,SIBANG CAVE,CALABA is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱18,817,673.24. Status: Reported complete (DPWH). Contractor on record: CAMIA CONST DEVELOPMENT CORP FORMERLY:CAM. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-16-0012658 · ₱3,968,267 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱18,817,673 · CAMIA CONST. DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-01-15 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS,SEAPORTS & DECLARED TOURISM DESTINATIONS: CONCRETING/IMPROVEMENT OF MAGSIDEL PORT-CALAYAN,POBLACION-SIBANG COVE ROAD,CALAYAN,CAGAYAN LEADING TO SIBANG COVE,CARARANGATAN CAVE,SIBANG CAVE,CALABA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Matalag River Flood Control, Rizal, Cagayan
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0012658

₱3,968,267.00 · FY2016

Released to Soccsksargen Centers for Health Development To (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONST/IMP.OF ACCESS RDS LEADING TO AIRPORTS,SEAPOR

₱18,817,673.24 · CAMIA CONST. DEVELOPMENT

Award / contract ref: 15BC0167 RE-ADV

Contractor

C

60 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) AYAGA - STA. MARCELA - FLORA - LASAM ROAD, CHAINAGE 12937 - CHAINAGE 14620, CHAINAGE 14694 - CHAINANGE 180

Cordillera Administrative Region, Cordillera Administrative Region

2017₱144.8M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - TERTIARY ROADS APAYAO ILOCOS NORTE ROADS, K0626+301 - K0628+801

Apayao 1st DEO, Cordillera Administrative Region

2017₱96.5M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) AYAGA-STA. MARCELA-FLORA-LASAM ROAD (22619-23768)-(23777-24448)-(24489-26002), APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2018₱93.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS - (3 UNITS - FOUR (4) STOREY SIXTEEN (16) CL SCHOOL BUILDING) (BUILDING -A, BUILDING-B AND BUILDING-C), CAGAYAN NATIONAL HIGH SCHOOL, TUGUEGARAO CITY

Cagayan 3rd DEO, Region II

2016₱79.1M
Reported complete (DPWH)
No sat.

LOCAL PROG. - LOCAL ROADS & BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD (MANAOAG BRIDGE), IGUIG, CAGAYAN

Cagayan 3rd DEO, Region II

2021₱67.5M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) CLAVERIA-CALANASAN-KABUGAO ROAD, KO673+234-K0674+303, CALANASAN, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2018₱59.0M
Reported complete (DPWH)
View all 60 projects →

4. Implementation

Contract Amount

₱18,817,673.24

Progress

Reported complete (DPWH)

Start Date

March 28, 2016

Target End

October 22, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanCalayanMagsidel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.