CLUSTER 5: 1. CONT. OF (3) UNITS RAIN WATER COLLECTOR @ TAMPUS IS; 2. CONT. OF (3) UNITS RAIN WATER COLLECTOR @TONA LIM SIAO, SR. ES (PUNSAD ES); 3. CONT. OF (3) UNITS RAIN WATER COLLECTOR @BATULAKI IS; 4. CONT. OF (3) UNITS RAIN WATER COLLECTOR @ CABLALA
CLUSTER 5: 1. CONT. OF (3) UNITS RAIN WATER COLLECTOR @ TAMPUS IS; 2. CONT. OF (3) UNITS RAIN WATER COLLECTOR @TONA LIM SIAO, SR. ES (PUNSAD ES); 3. CONT. OF (3) UNITS RAIN WATER COLLECTOR @BATULAKI IS; 4. CONT. OF (3) UNITS RAIN WATER COLLECTOR @ CABLALA is a DPWH-tracked public work in Sarangani DEO, Region XII. Reported contract value: ₱1,148,063.20. Status: Reported complete (DPWH). Contractor on record: BR GULTIANO CONST 36401. Figures trace to dpwh.
Total Contract Cost
