Buildings and Facilities17EE0158No coordinates published by DPWH

CLUSTER IV - CONSTRUCTION OF 2 UNITS UNIQUE WORKSHOP BUILDING SANDOVALNATIONAL HIGH SCHOOL, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULAR WORKSHOP BUILDING PANCOL NATIONAL HIGH SCHOOL, BANBANAN EXTENSION, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULA

CLUSTER IV - CONSTRUCTION OF 2 UNITS UNIQUE WORKSHOP BUILDING SANDOVALNATIONAL HIGH SCHOOL, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULAR WORKSHOP BUILDING PANCOL NATIONAL HIGH SCHOOL, BANBANAN EXTENSION, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULA is a DPWH-tracked public work in Palawan 1st DEO, Region IV-B. Reported contract value: ₱11,737,905.98. Status: Reported complete (DPWH). Contractor on record: MARYKNOLL BUILDERS AND SUPPLY. Figures trace to dpwh.

Palawan 1st DEO, Region IV-B

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region IV-B

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0024381 · ₱832,166 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17EE0158 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER IV - CONSTRUCTION OF 2 UNITS UNIQUE WORKSHOP BUILDING SANDOVALNATIONAL HIGH SCHOOL, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULAR WORKSHOP BUILDING PANCOL NATIONAL HIGH SCHOOL, BANBANAN EXTENSION, TAYTAY, PALAWAN/ CONSTRUCTION OF 1 UNIT REGULA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Dipuyai Bridge, Coron-Busuanga Road, Palawan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0024381

₱832,166.00 · FY2017

Released to 00000 - Supreme Court of To cover he Philippines and the Lower indi ourts (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱11,737,905.98

Progress

Reported complete (DPWH)

Start Date

January 21, 2018

Target End

September 17, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanTaytay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.