Buildings and Facilities18BC0123

CONSTRUCTION OF 1-STOREY 2-CLASSROOM WITH CR AT ABULUG NATIONAL RURAL AND VOCATIONAL HIGH SCHOOL, ABULUG, CAGAYAN

CONSTRUCTION OF 1-STOREY 2-CLASSROOM WITH CR AT ABULUG NATIONAL RURAL AND VOCATIONAL HIGH SCHOOL, ABULUG, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱2,611,045.39. Status: Reported complete (DPWH). Contractor on record: OLIVA DESIGN AND CONST. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROII-18-0002813 · ₱6,117,152 · release to the district office, not itemized per project

    Possible match · score 0.82

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18BC0123 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-20 → 2024-09-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,305,523 per classroom= 1.0x the Region II median (n=370)

Contract cost ₱2,611,045 ÷ 2 classroom read from the DPWH title (“2-CLASSROOM”; classroom count in title). National percentile: 23. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1-STOREY 2-CLASSROOM WITH CR AT ABULUG NATIONAL RURAL AND VOCATIONAL HIGH SCHOOL, ABULUG, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Abulug River Control, Libertad, Abulug, Cagayan
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-18-0002813

₱6,117,152.00 · FY2018

Released to Regional Office - II (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

78 projects · ₱696.5M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SANCHEZ MIRA FLOOD STRUCTURE A

Cagayan 2nd DEO, Region II

2025₱72.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NORTHWESTERN CAGAYAN GENERAL HOSPITAL) PACKAGE 2, PINILI, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (NORTHWESTERN CAGAYAN GENERAL HOSPITAL), PINILI, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱49.5M
Reported complete (DPWH)
No sat.

CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ABULUG-BALLESTEROS BAY VIEW BOULEVARD INCLUDING ACCESS ROAD LEADING TO BEACH RESORTS, ABULUG, CAGAYAN (PHASE 4)

Cagayan 2nd DEO, Region II

2022₱29.1M
Reported complete (DPWH)
No sat.

CSSP- BASIC INFRASTRUCTURE PROGRAM (BIP)-EVACUATION CENTERS / QUARANTINE FACILITIES / PUBLIC HEALTH FACILITIES-COUNSTRUCTION OF MULTI-PURPOSE BUILDING (NORTHWESTERN CAGAYAN GENERAL HOSPITAL), BRGY. PINILI, ABULUG, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱24.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM- ROLL-IT) STO. TOMAS BARANGAY ROAD LEADING TO MANI

Cagayan 2nd DEO, Region II

2024₱24.5M
Reported complete (DPWH)
View all 78 projects →

4. Implementation

Contract Amount

₱2,611,045.39

Progress

Reported complete (DPWH)

Start Date

June 28, 2018

Target End

December 10, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanAbulugBanguian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.