Buildings and Facilities18DD0400

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF A MULTI-PURPOSE BUILDING, PUBLIC MARKET (PHASE III), BARANGAY TAYSAN, SAN JOSE, BATANGAS

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF A MULTI-PURPOSE BUILDING, PUBLIC MARKET (PHASE III), BARANGAY TAYSAN, SAN JOSE, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱9,801,000.00. Status: Reported complete (DPWH). Contractor on record: N A ONA CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-B-18-0016454 · ₱15,000,000 · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18DD0400 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-01-03 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF A MULTI-PURPOSE BUILDING, PUBLIC MARKET (PHASE III), BARANGAY TAYSAN, SAN JOSE, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Slope Protection/Revetment at Abung Br., San Juan, Batangas
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-18-0016454

₱15,000,000.00 · FY2018

Released to Regional Office - IVA (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

22 projects · ₱115.9M total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - RECONSTRUCTION OF ACCESS ROAD LEADING TO YAMBAO LAKE, BARANGAY ALUMBRADO TO BARANGAY SULSUGUIN, NAGCARLAN, LAGUNA

Laguna 3rd DEO, Region IV-A

2021₱24.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, REHABILITATION/ IMPROVEMENT OF THE SAN JOSE PUBLIC MARKET, SAN JOSE, BATANGAS

Batangas 4th DEO, Region IV-A

2018₱9.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - ASPHALT OVERLAY OF BARANGAY ROAD, BARANGAY PALMA TO BARANGAY SAN MIGUEL, ALAMINOS, LAGUNA

Laguna 3rd DEO, Region IV-A

2021₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MALAGASANG I-C (JADE RESIDENCES), IMUS, CAVITE

Cavite 1st DEO, Region IV-A

2023₱6.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ALAPAN II-A, IMUS, CAVITE

Cavite 1st DEO, Region IV-A

2023₱6.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TOCLONG IA, IMUS CITY, CAVITE

Cavite 1st DEO, Region IV-A

2022₱5.0M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱9,801,000.00

Progress

Reported complete (DPWH)

Start Date

July 30, 2018

Target End

December 26, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF A MULTI-PURPOSE BUILDING, PUBLIC MARKET (PHASE III), BARANGAY TAYSAN, SAN JOSE, BATANGAS.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/3498b9ab-1719-4910-9580-d61ed8105ab6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasSan JoseTaysan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.