Water Provision and Storage23FN0091

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR LEVEL 2 WATER SYSTEM AT BRGY. IRAYA, BUHI, CAMARINES SUR

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR LEVEL 2 WATER SYSTEM AT BRGY. IRAYA, BUHI, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱9,800,000.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: RICHMAR CONST. Figures trace to dpwh.

Camarines Sur 5th DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FN0091 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-12-29 → 2019-12-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR LEVEL 2 WATER SYSTEM AT BRGY. IRAYA, BUHI, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Pacol Flood Control, Brgy. Pacol, Naga City, Camarines Sur
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Camarines Sur 5th DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱9,800,000.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

October 16, 2023

Target End

June 11, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS- WATER SUPPLY SYSTEM-CONSTRUCTION OF SOLAR LEVEL 2 WATER SYSTEM AT BRGY. IRAYA, BUHI, CAMARINES SUR.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/34cbb365-f997-4374-8418-c215c2adf417

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurBuhiIraya
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.