Roads24C00403

ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF PAMPANGA

ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF PAMPANGA is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱231,597,573.34. Status: Past target date (DPWH On-Going). Contractor on record: R D POLICARPIO. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24C00403 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    82% reported · imagery 2023-09-07 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

14 projects · ₱1.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURES ALONG TELABASTAGAN-SAINT JUDE CREEK, SAN FDO. CITY

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD, ZAMBALES SECTION (PACKAGE 1), PROVINCE OF ZAMBALES

Region III, Region III

2020₱162.0M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD (PACKAGE 1), PROVINCE OF ZAMBALES

Region III, Region III

2019₱142.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN RD - K0096+835.71-K0097+679, K0097+740-K0098+691, K0099+000-K0099+961, K0101+000-K0101+829, K0102+000-K0103+000, PORAC AND FLORIDABLANCA, PAMPA

Pampanga 2nd DEO, Region III

2023₱96.5M
Reported complete (DPWH)

FLOOD CONTROL WORKS-IMPROVEMENT/REHABILITATION OF WEST LATERAL DIKE OF MEGADIKE ALONG PASIG-POTRERO, STA. RITA AND PORAC, PAMPANGA

Flood Control Management Cluster, Central Office

2019₱95.0M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJ./STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. (COMPL.) OF SN. AGUSTIN BR. (BO1482LZ) INCL. SPW ALONG JASA, ARAYAT, P

Region III, Region III

2024₱94.6M
Past target date (DPWH On-Going)
View all 14 projects →

4. Implementation

Contract Amount

₱231,597,573.34

Progress

Past target date (DPWH On-Going)

Start Date

July 29, 2024

Target End

September 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaCity of San FernandoSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.