CONSTRUCTION OF FLOOD MITIGATING STUCTURE ALONG BALUTAKAY RIVER LEFT & RIGHT SIDE DOWNSTREAM SECTION OF BALUTAKAY-HAGONOY BRIDGE (B00165MN), BALUTAKAY, HAGONOY, DAVAO DEL SUR
CONSTRUCTION OF FLOOD MITIGATING STUCTURE ALONG BALUTAKAY RIVER LEFT & RIGHT SIDE DOWNSTREAM SECTION OF BALUTAKAY-HAGONOY BRIDGE (B00165MN), BALUTAKAY, HAGONOY, DAVAO DEL SUR is a DPWH-tracked public work in Davao del Sur DEO, Region XI. Reported contract value: ₱98,900,000.00. Status: Past target date (DPWH On-Going). Contractor on record: ROIM BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
