Roads21PD0091

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AND RIPRAP ALONG CLEMENT ABAD RESIDENCE AT PUROK 3 LOAKAN-APUGAN BARANGAY, BAGUIO CITY

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AND RIPRAP ALONG CLEMENT ABAD RESIDENCE AT PUROK 3 LOAKAN-APUGAN BARANGAY, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱2,844,539.08. Status: Reported complete (DPWH). Contractor on record: JJJ-A CONST AND SUPPLIES. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱2,585,945 · JJJ-A CONSTRUCTION AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-03-09 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AND RIPRAP ALONG CLEMENT ABAD RESIDENCE AT PUROK 3 LOAKAN-APUGAN BARANGAY, BAGUIO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction (Continuation) of the Flood Control along Bued River (concrete wall near AGAPE Family Christian Church) at Camp 7 Barangay, Camp 7 Barangay, Baguio City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Baguio City DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Civil Works

₱2,585,944.62 · JJJ-A CONSTRUCTION AND SUPPLIES

Award / contract ref: 21PD0091

Contractor

B

17 projects · ₱150.0M total · 0 flags

Other projects by this contractor

No sat.

NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND (CALAMITY FUND)- RECONSTRUCTION, REHABILITATION , REPAIR, AID, RELIEF AND OTHER WORKS OR SERVICES, INCLUDING PRE-DISASTER ACTIVITIES: IMPLEMENTATION OF VARIOUS FLOOD CONTROL PROJECTS IN MOUNTAIN PROVINC

Mountain Province 1st DEO, Cordillera Administrative Region

2017₱89.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMICZONES, BILA-BAGNEN ORIENTE ROAD IN SUPPORT TO AGRIBUSINESS, COFFEE AND FOOD PROCESSING INDUSTRIES, BAUKO, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2018₱23.6M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD LOCATED AT PUROK 2, MONTICELLO, BARANGAY CAMP 7, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2022₱4.7M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF ROAD AT LOT 2 AND 3, CYPRESS, PUROK 14, IRISAN BARANGAY, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2021₱3.8M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF 2-STOREY FOUR CLASSROM SCHOOL BUILDING AT DONA AURORA NATIONAL HIGH SCHOOL, BARANGAY LOPEZ JAENA, BAGUIO CITY, BENGUET

Baguio City DEO, Cordillera Administrative Region

2019₱3.7M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF A FOOTBRIDGE ALONG BONIFACIO STREET, A. BONIFACIO-CAGUIOA-RIMANDO, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2018₱2.5M
Reported complete (DPWH)
View all 17 projects →

4. Implementation

Contract Amount

₱2,844,539.08

Progress

Reported complete (DPWH)

Start Date

September 21, 2021

Target End

March 20, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioApugan-Loakan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.