DPWH projects in Baguio City
866 DPWH public works projects are recorded in Baguio City (Cordillera Administrative Region), with start dates from 2016 to 2025. Recorded contract values total about ₱10,290,139,911.06. 797 are recorded at 100% progress and 83 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Contract Package 1: Const/Reh of Flood Mitigation Facilities Within Major River Basins and Principal Rivers Const. of Flood Mitigation Facilities Along A. Balili River (Main) Sta. 1+297-Sta. 1+400 B. Asin-Gallano River Sta. 2+240-Sta. 2+788₱139,777,419.83
- Contract Package 1: A. Preventive Maintenance -Secondary Roads: 1. Asin Rd. K0305+(-535), K0305+000-K0306+541, (S04722lz) Chainage 000-Chainage 1552. Loakan Rd. K0249+875-K0250+096, K0250+380-K0250+842 3. Magsaysay Ave (Trinidad Rd) - (S00522lz) Chainage₱138,087,000.00
- Contract Package 3: Preventive Maintenance-A. Secondary Roads: 1. Westernlink Circumferential Road. K0246+(-026)-K0247+098, K0247+870-K0249+371, K0249+1002-K0250+000,Ko249+371-K0249+503, K0249+996-K0249+1002, K0250+000-K0250+501 2. Leonard Wood Rd. K0250+₱126,734,000.00
- Contract Package 6: Reh/Reconst. of Roads With Slips, Slope Collapse, and Landslide: A. Secondary Roads: 1. Pma Rd. K0249+480-K0249+598 B. Tertiary Roads: 1. Easternlink Circum Rd. K0247+930-K0247+980 2. Pma Cut-Off Rd. 3- (S05054lz): Ch. 1600 - Ch. 1700₱124,656,000.00
- Contract Package 2: Const/Rehab. of Flood Mitigation Facilities Within Major River Basins and Principal Rivers-Construction of Flood Mitigation Facilities Along A) Bued River (Main) Sta. 0+050 -Sta. 0+170 B) Bued River (Tributaries) Sta. 0+520-Sta. 0+580,₱118,537,100.26
- Contract Package 4-Const/Maint of Flood Mitigation Structures and Drainage Syst: 1 Const/Reh. of Flood Mitigation Facilities Along Balili River (Main), Baguio City 2. Const/Reh. of Flood Mitigation Facilities Along Balili River (Tributaries)₱97,381,085.66
- Construction/Maintenance of Flood Mitigation Structures and Drainage System-Construction of Flood Mitigation Facilities Along Abad Santos Drive to Lake Drive to Perfecto St. and Harrison Road, Baguio City₱96,500,000.00
- Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rainwater Collector System: Construction of Pma Rainwater Harvesting Facilities Phase Iii, Philippine Military Academy, Fort del Pilar, Baguio City₱96,500,000.00
- Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide-Secondary Roads-Marcos Hi-Way K0280+(-313)-K0280+(-036), K0280+430-K0280+870,K0282+876-K0283+454₱95,535,000.00
- Construction of By-Pass and Diversion Roads: Major Mane to Kennon Road, Baguio City₱92,588,855.00
- Construction of By-Pass and Diversion Roads Major Mane to Kennon Road Bypass Road, Baguio City₱91,675,000.00
- Contract Package 6: Preventive Maintenance: A. Secondary Roads: 1. Marcos Hi-Way K0282+870-K0283+438 2. Westernlink Circumferential Rd. K0281+(-298)-K0283+438 3. Session Rd #2 K0251+404-K0252+047 4. Major Mane Rd K0247+050-K0247+353 B 1. F. Calderon St.₱90,342,550.36
- Contract Package 3: Preventive Maintenance; A. Primary Roads-Harrison Rd. No. 1 (S04713lz) Chainage 0-Chainage 22, Chainage 212-Chainage 414, Chainage 22-Chainage 212, Chainage 414-Chainage 807 (S04714lz) Chainage0-Chainage 414 B. Secondary Roads-Loakan R₱89,267,220.00
- Network Development-Construction of By-Pass and Diversion Roads, Magsaysay Ave (Trinidad Road) to Rimando - Ambiong Bypass, Incl. Bridge and Row, Baguio City₱88,099,659.56
- Contract Package 5: Preventive Maintenance: Primary Roads: A. Kennon Road K0242+000k0242+579, K0244+881+375, K0245+423-K0245+884,K0246+358-K0246+537, K0247+000-K0247+203 B. Quirino H-Way (Baguio-Bauang) K0301+786-K0303+100, K0303+863-K0305+630, C. Gov. Pa₱87,196,808.58
- Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse and Landslide -Primary Roads; Kennon Rd. K0245+884-K0246+358,K0246+537-K0246+733₱85,863,074.53
- Construction/Improvement of Various Infrastructure in Support of National Security-Construction of Perimeter Access Road, Philippine Military Academy, Baguio City₱82,420,429.11
- Construction of Pma Access Road From Globe Tower to Sao Area, Philippine Military Academy, Fort del Pilar, Baguio City, Phase Ii₱82,025,000.00
- Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide -Marcos Hi-Way K0281+755 - K0283+454, K0281+755 - K0282+000, K0281+755 - K0283+454, K0282+000 - K0283+454₱80,433,045.00
- Contract Package 4: Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse and Landslide: A. Kennon Rd. K0241+790-K0241+825, K0242+430-K0242+480, K0242+600-K0242+720, K0244+015-K0244+050, K0244+350 B. Major Mane Rd. K0247+865-K0247+895₱78,722,500.00
- Asset Preservation-Rehabilitation/Reconstruction of Baguio City Roads W/ Slip, Slope Collapse and Landslide: Kennon Rd., Ko242+016-Ko242+064; Ko242+510-Ko242+730₱74,379,217.44
- Contract Package 2: Preventive Maintenance-Tertiary Roads: A. Abanao Ext. -(S00429lz) Chainage 0-Chainage 29, Chainage156-Chainage275, (S0505lz) Chainage 111-Chainage 232 B.Chuntug #1-(S00427lz) Chainage 0-Chianage218 C. Govt Ctr.Cut Off Rd K0249+(-011)-₱72,551,360.00
- Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rainwater Collector System-Construction of Pma Rainwater Harvesting Facilities, Philippine Military Academy, Fort del Pilar, Baguio City₱72,375,000.00
- Construction/ Improvement of Various Infrastructure in Support of National Security (Tatag ng Imprastraktura Para sa Kapayapaan at Seguridad Program - Tikas): Construction of Pma Access Road From Globe Tower to Sao Area, Philippine Military Academy, Fort₱72,375,000.00
- Construction of Flood Mitigation Structure-Construction/Rehabilitation of Flood Mitigation Facilities/Drainage System Along Bued River (Tributaries), Baguio City₱72,172,350.00