Construction of Drainage Structure21PK0019

Construction of Amdalao Drainage Systems Sta. 175+590 - Sta. 175+720 (B.S), Sitio Amdalao, Guina-ang, Pasil, Kalinga

Construction of Amdalao Drainage Systems Sta. 175+590 - Sta. 175+720 (B.S), Sitio Amdalao, Guina-ang, Pasil, Kalinga is a DPWH-tracked public work in KALINGA, Cordillera Administrative Region. Reported contract value: ₱1,888,990.97. Status: Reported complete (DPWH). Contractor on record: RAD CONST. Figures trace to sumbong.

KALINGA, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱20,346

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0007325 · ₱10,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21PK0019 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Kalinga

Based on the coordinates published with the DPWH record and NOAH file Kalinga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Amdalao Drainage Systems Sta. 175+590 - Sta. 175+720 (B.S), Sitio Amdalao, Guina-ang, Pasil, Kalinga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,346,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dun-ol Sangab Flood Control along Pasil River Sta.175+270 - Sta 175+630 (L.S.), Amdalao, Guina-ang, Pasil, Kalinga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0007325

₱10,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0013812

₱4,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0013843

₱2,000,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0014073

₱13,500,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-21-0010412

₱66,254.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-21-0013450

₱28,564.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-CAR-21-0010411

₱731,863.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

21 projects · ₱81.0M total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAGALUAN BYPASS ROAD, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2024₱7.7M
Past target date (DPWH On-Going)
No sat.

Construction of Flood Control Structures, Saltan, Biyog Creek, Batong Buhay NHS, Mataliling Kiloy, Mabilong in Barangay Balbalasang, Barangay Balatoc, Barangay Upper Uma, Barangay Mabilong, Balbalan, Pasil and Lubuagan, Kalinga

PASIL (KALINGA), KALINGA, Cordillera Administrative Region

2024₱6.9M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BALBALASANG, MABILONG (MANANGOL AND SABULAK), DANGOY, WESTERN UMA, ABLEG, BALBALAN,

Upper Kalinga DEO, Cordillera Administrative Region

2025₱6.9M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POSWOY, TALALANG, BALBALAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2025₱5.9M
Past target date (DPWH On-Going)
No sat.

Construction of Drainage Canal System in Barangay Malucsad (Abis Creek), Pasil, Kalinga and Barangay Balbalasang (Balbalasang Elementary School), Balbalan, Kalinga

BALBALAN (KALINGA), KALINGA, Cordillera Administrative Region

2023₱5.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE GYM, BARANGAY BALINCIAGAO NORTE, CAGALUAN, BALATOC, PASIL, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2025₱4.9M
Past target date (DPWH On-Going)
View all 21 projects →

4. Implementation

Contract Amount

₱1,888,990.97

Progress

Reported complete (DPWH)

Start Date

April 10, 2022

Target End

June 8, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaPasilGuina-ang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.