Roads24DF0149

ORGANIZATIONAL OUTCOME 1 :ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037+543 - K0037+959, K0038+878 - K0039+293

ORGANIZATIONAL OUTCOME 1 :ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037+543 - K0037+959, K0038+878 - K0039+293 is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱24,879,516.65. Status: Past target date (DPWH On-Going). Contractor on record: SOUTHFOUR BUILDERS CORP. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱8,000 (shared by many projects, not this project's own line)

    Possible match · score 0.78

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DF0149 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2023-03-06 → 2025-04-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱29,939,250 per km= 0.7x the Region IV-A median (n=330)

Contract cost ₱24,879,517 ÷ 0.831 km read from the DPWH title (“K0037+543 - K0037+959; K0038+878 - K0039+293”; K-post / station range length). National percentile: 38. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1 :ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0037+543 - K0037+959, K0038+878 - K0039+293

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 78%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure and Other Improvements, Brgy. Molino 4, Zapote River, Bacoor, Cavite
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Cavite 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

10 projects · ₱263.2M total · 0 flags

Other projects by this contractor

View all 10 projects →

4. Implementation

Contract Amount

₱24,879,516.65

Progress

Past target date (DPWH On-Going)

Start Date

April 2, 2024

Target End

August 19, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteTanzaBiga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.