Roads24JA0114

CONCRETING OF BRGY. GUISAO FMR, BRGY. GUISAO, ZAMBOANGA CITY

CONCRETING OF BRGY. GUISAO FMR, BRGY. GUISAO, ZAMBOANGA CITY is a DPWH-tracked public work in Zamboanga City 2nd DEO, Region IX. Reported contract value: ₱9,910,828.68. Status: Past target date (DPWH On-Going). Contractor on record: RR-JAM CONST. Figures trace to dpwh.

Zamboanga City 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱15,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24JA0114 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    97% reported · imagery 2021-03-02 → 2025-03-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. GUISAO FMR, BRGY. GUISAO, ZAMBOANGA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Sanga Pressa Creek, Km. 4, Brgy. Pasonanca, Zamboanga City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Zamboanga City 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

23 projects · ₱395.7M total · 0 flags

Other projects by this contractor

No sat.

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY LANDANG GUA, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2025₱47.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PASILMANTA, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2025₱47.6M
Past target date (DPWH On-Going)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SIRATANG-SUBAH MAMAH, LANGUYAN, TAWI-TAWI

Region IX, Region IX

2024₱33.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF THREE (3) STORY NINE (9) CLASSROOM SCHOOL BUILDING AT LUMBANGAN ELEMENTARY SCHOOL, BARANGAY LUMBANGAN, ZAMBOANGA CITY, ZAMBOANGA DEL SUR

Zamboanga City 2nd DEO, Region IX

2023₱29.7M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT OF ROAD, BARANGAY MARANG-MARANG TO BRGY. LUKBUTON, ISABELA CITY, BASILAN

Isabela City DEO, Region IX

2023₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BRGY. LUKBUTON TO BRGY. PANIGAYAN LEADING TO WHITE BEACH, MALAMAWI ISLAND, ISABELA CITY, BASILAN

Region IX, Region IX

2023₱27.9M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱9,910,828.68

Progress

Past target date (DPWH On-Going)

Start Date

June 24, 2024

Target End

December 9, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)City of ZamboangaGuisao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.