Water Provision and Storage17PK0046No coordinates published by DPWH

CONSTRUCTION OF WATER SYSTEM (LEVEL II) PASIL, KALINGA

CONSTRUCTION OF WATER SYSTEM (LEVEL II) PASIL, KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱4,602,162.33. Status: Reported complete (DPWH). Contractor on record: SONBLESSED CONST AND SUPPLY. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱10,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-17-0025913 · · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17PK0046 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF WATER SYSTEM (LEVEL II) PASIL, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Ambato Flood Control, Kalinga
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-17-0025913

₱-123,702.00 · FY2017

Released to Mountain Province Iss First District Engineering all Office non (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

62 projects · ₱291.6M total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 1 - REPAIR/REHABILITATION OF DAMAGED SLOPE PROTECTION ALONG LUBUAGAN - BATONG BUHAY - ABRA BDRY. ROAD K0474+960 - K0475+050

Upper Kalinga DEO, Cordillera Administrative Region

2020₱23.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT R

Upper Kalinga DEO, Cordillera Administrative Region

2020₱18.2M
Reported complete (DPWH)
No sat.

CONCRETING OF SUKIAP (TANGLAG) - MABONGTOT FMR, BRGY. MABONGTOT, LUBUAGAN, KALINGA.

Upper Kalinga DEO, Cordillera Administrative Region

2024₱14.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: TERTIARY ROADS - LUBUAGAN-BATONG BUHAY-ABRA ROAD - K0465+190-K0465+250,

Upper Kalinga DEO, Cordillera Administrative Region

2023₱11.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION: REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS ALONG LUBUAGAN - BATONG BUHAY - ABRA BOUNDARY ROAD, LUBUAGAN K

Upper Kalinga DEO, Cordillera Administrative Region

2022₱11.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - MOUNTAIN PROVINCE BOUNDARY CAGALUAN JU

Upper Kalinga DEO, Cordillera Administrative Region

2024₱9.8M
Reported complete (DPWH)
View all 62 projects →

4. Implementation

Contract Amount

₱4,602,162.33

Progress

Reported complete (DPWH)

Start Date

July 3, 2017

Target End

October 30, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.